
STEP ONE: Install Canister and Extrusion with End Caps
1. Draw a straight line along tub edge where you would like to position your rail.
2. Place
on left or right side of shower with handle facing outward (HANDLE IS THE LATCH
DEVICE). Position the rail end cap at the edge of your pencil line. Use a level to ensure
is
vertical. Peel off tape from
as shown, and press firmly against wall.
3. Position
with the lower rail end cap
at the edge of your pencil line. Use level to ensure
is vertical. Peel off tape from
, and press firmly against wall.
• 2 •
www.newlinebathroom.com
A
A
D
D
TAPE
TAPE
NOTE:
DO NOT REMOVE
PART C
UNTIL
PART D
IS INSTALLED
RAIL END
CAP ON
THE LINE
RAIL END CAP
(
PART C
) ON
THE LINE
A
A
A
C
D
D
D