
21
2.6
Installing the OPS (Optional)
The OPS does not support hot plugging. Therefore, you must insert or remove the OPS when
the display is powered off. Otherwise, the display or OPS may be damaged.
You will need to purchase the OPS separately. Perform the following steps to install the OPS.
Step 1
Unscrew the M4 screws by hand to remove the OPS protective cover.
Step 2
Push the OPS into the OPS port on the rear of the panel until firmly seated, using the M4
screws to secure the OPS.
2.7 Installing the SDM-S (
Not included
)
The SDM-S does not support hot plugging. Therefore, you must insert or remove the SDM-S
when the display is powered off. Otherwise, the display or SDM-S may be damaged.
Currently we don't provide SDM-S, but if you have a SDM-S to use, please install referring to
the following steps.
Step 1
Unscrew the 2 screws on the SDM-S slot and remove the shielding cover.
Содержание Q+ Series
Страница 15: ...15 2 Installation Guide 2 1 Safety Precautions Installation Environment...
Страница 26: ...26 Step 4 Select in the Tablet PC Settings window...
Страница 85: ...85 Note Users also can click the icon name to modify as your need...
Страница 96: ...96 OP backlight brightness QR backlight state ST Whiteboard state UV Screen lock state...