![New Leader L5034G4 AGCO Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/new-leader/l5034g4-agco/l5034g4-agco_operators-manual_1677966029.webp)
- 29 -
L5034G4 AGCO
www.NewLeader.com
(800) 363-1771
306375-AA-E
General Operating Procedures
1� Make sure unit has been properly serviced and is in good operating condition� It is highly recommended
to run the spreader prior to loading material to ensure acceptable operation�
2� Program controller with correct data for material(s) and application�
3� Adjust feedgate to appropriate setting�
4� Adjust spinner to give spread pattern desired� Calibrate and spread pattern test for any new material�
5� Fill applicable bins with material to be spread�
6� Engage hydraulics�
7� Begin spreading�
CAUTION
Drive only at speeds which permit secure control of vehicle�
NOTICE!
CHANGE HYDRAULIC OIL FILTER AFTER FIRST WEEK (OR NOT MORE THAN 50 HOURS)
OF OPERATION ON A UNIT�
*Visit
newleader.highwayequipment.com/calculators/yield-output
for interactive tools to calculate yield,
proper feedgate opening, conveyor revolutions per minute and mph to maximize the performance of your
spreader�
Содержание L5034G4 AGCO
Страница 5: ...5 L5034G4 AGCO www NewLeader com 800 363 1771 306375 AA E This page is intentionally left blank Notes...
Страница 6: ...Insert Current New Leader Warranty Warranty...
Страница 37: ...37 L5034G4 AGCO www NewLeader com 800 363 1771 306375 AA E Troubleshooting Hydraulic Schematic...
Страница 76: ...76 Notes This Page Intentionally Left Blank...