6
STEP 1 – Main Frame Assembly
a)
Remove the Allen Bolts, Washers,
Nuts and Nut Caps from the Foot
Base on the Main Frame Assembly.
Slip the Roller Tubes onto the Main
Frame making sure the Roller Tracks
are facing up and the Bolt Holes on
the rear of the Roller Tubes are facing
each other. To secure the Roller
Tubes to the Base Frame replace
the Bolts and Washers you just
removed.
b)
Remove the Allen Bolts and Washers
from the rear of the Roller Tubes. Place
the Stabilizer Bar (with the Warning
Label up) between the Roller Tubes.
Replace the Bolts and Washers you
just removed.
c)
Tighten all bolts with Wrench provided.
right
roller tube
left
roller tube
roller tracks
foot
base
main
frame
assembly
stabilizer
bar
remove bolts
and washers
1a
1b
1a
1a
STEP 2 – Foot Platform Assembly
NOTE: The Foot Platforms are interchangeable
a)
Remove the Allen Bolts, Washers and Nylon Nuts from
the bottom of the Foot Platform.
b)
Note: This Step might be easier if you have a second
person hold the Foot Tube or Foot Platform steady as
you slide the Foot Platform on and secure it.
Position the Crank in the down stroke and carefully
slide the Foot Platform Assembly onto the Front Foot
Tube. Replace the Bolts and Washers you just removed
in step (a). Tighten with Wrench provided.
c)
Carefully lay the Foot
Platform down so the
Roller seats itself into
the Roller Track on the
Roller Tube.
Repeat on other side.
front
foot tube
foot
platform
assembly
main
frame
connecting
arm
crank
(in down
stroke)
2b
Roller should
seat itself in
track
2c