305
08
|
Maintenance and Repair
8.3
Quarterly Inspection
Quarterly inspections deal with inspection items that can be checked even during robot operation,
and that must be inspected after by turning off the power. Be sure to disconnect the power cable
from the power socket when powering off is necessary.
Inspection Interval
One or more times quarterly
Inspection Method
Robot arm
Check the exterior appearance of the robot and keep the joint connection gaps with
frequent movements especially clean. Also, please check whether fastening condition of
every part is not loose due to the vibration continuously generated by the robot
operation.
Inspection item
Inspection method
exterior inspection
Check for contaminants such as dirt and dust.
Make sure that there is no foreign material at each joint.
Make sure that each joint is spaced in parallel, or at
regular gap.
Make sure that the bolts exposed outside or the bolts
securing the base and the tool are not loose.
Control box
Check the exterior appearance of the control box and the appearance of the connectors
and the cables connected to the control box. If necessary, check the control box for
noise or vibration.
Inspection item
Inspection method
cable appearance
Make sure that the wire sheath is not peeled off.
connector appearance
Check the connector for cracks or damage.
connection status
Make sure that no connectors are loose or disconnected.
Make sure that the cable is not disconnected from every
connector.
noise, vibration
Check for noise or vibration around the cooling fan.
Содержание INDY7
Страница 1: ...Version 2 3 0 2019 08 16...
Страница 2: ......
Страница 3: ......
Страница 5: ...5...
Страница 8: ......
Страница 12: ......
Страница 15: ......
Страница 128: ...128 05 Programming Now your jointMove setup is complete...
Страница 136: ...136 05 Programming Finally enter the motion name and touch OK Now the frameMove setting is complete...
Страница 144: ...144 05 Programming Now the setting for the blending of frameMove is completed...
Страница 152: ...152 05 Programming Now your home movement setup is complete...
Страница 162: ...162 05 Programming stop It stops program execution No setup is required...
Страница 257: ...257 The commands that can be executed by the digital input signals are listed as follows...
Страница 259: ...259 When the message Do you want to renew it appears touch Yes The message Renewal is complete is displayed Touch OK...
Страница 264: ...264 Robot statuses that can be associated with the digital output signals are listed as follows...
Страница 266: ...266 When the message Do you want to renew it appears touch Yes The message Renewal is complete is displayed Touch OK...
Страница 279: ...279 If you run Conty again the language is changed and shown as follows...
Страница 319: ...319 08 Maintenance and Repair On the next Maintenance Service screen touch Log Touch Sending Log...
Страница 321: ...321 09 Certification 9 Certification 9 1 Machinery Directive...
Страница 322: ...322 09 Certification 9 2 Electromagnetic Compatibility Directive...
Страница 325: ...325 10 Warranty Neuromeka Official Channal Copyright 2016 2022 Neuromeka All rights reserved www neuromeka com...