
Web Support
Phone Support
This chapter provides information on:
·
Preparing the site
·
Package contents
·
Required tools
·
Installing the hub
·
Connecting the hub
·
Completing and verifying the installation
Preparing the Site
Before you begin installing the Model EN516 hub, prepare the installation site.
Make sure the operating environment meets the physical requirements of the hub.
The ambient temperature must be between 0° C and 40° C. The maximum relative
humidity must not exceed 90%.
You can install the hub on a flat surface, such as a tabletop or shelf, or within a
standard 19-inch rack. You should ensure that the front and rear panel of all units
to be connected are easily accessible for connecting cables and power and for
monitoring the LED indicators.
Package Contents
The package should contain the following items:
·
Model EN516 hub
·
This manual
·
AC power cord
·
Rack mount kit
·
Four rubber pads for installation on a flat surface
·
One BNC T-connector
·
One BNC terminator
·
Warranty and Owner Registration Card
CAUTION:
Use the appropriate power cord as required by your national
electrical codes and ordinances.
Call your dealer if there are any wrong, missing, or damaged parts. Keep the
carton, including the original packing materials. Use them to repack the hub if
there is a need to return it for repair.