![NetApp SteelStore 30 Series Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/netapp/steelstore-30-series/steelstore-30-series_owners-manual_1669963034.webp)
Installation
29
3.4 Installation
3.4.1 Equipment
The following equipment is required for installation:
• The chassis, including the following:
–
Backplane PCB.
–
ATX motherboard.
–
Enclosure Management Card (EM Card).
–
Ops Panel.
–
Blanking plates covering empty PCI slots.
• Power cord.
• Rack kit (if installing within a rack).
• The Accessory Box contains the power cords and other accessories.
• Flat blade screwdriver (not supplied).
• Torx T10 screwdriver (for drive module locks), included with each appliance.
3.4.2 Mounting the System into a Rack
The rail kit is suitable for 19-inch racks with square and round holes only.
• The minimum distance between vertical rack posts is 24 inches (610 mm)
• The maximum distance between vertical rack posts is 36 inches (914 mm)
Tools required:
• No.2 Phillips screwdriver or flat bladed screwdriver.
Installation procedure:
1
Remove the rack mounting rail kit from the accessory box and check for damage.
2
Ensure the pre-assembled rail is at its shortest length.
3
Locate the rail location pins inside the front of the rack post (see
). (The rail location pins are
pre-assembled to suit square hole or round hole racks. These pins should not be removed.)
4
Extend the rail to enable the rear location pins to locate in the rear rack post.
Содержание SteelStore 30 Series
Страница 3: ......
Страница 9: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 4...
Страница 29: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 24...
Страница 47: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 42...
Страница 65: ...NetApp SteelStore Cloud Integrated Storage xx30 Series Hardware Owner s Manual 60...