
8
NetApp AltaVault Cloud Integrated Storage Installation and Service Guide for Physical Appliances
NetApp AltaVault appliance setup preparation
Workflow diagram
Workflow diagram
Use the workflow diagram below as a guide to setting up your system.
Site clearance requirements
When planning the site for installing an AltaVault system, you must allow sufficient clearance around the chassis. The
same clearances are required for two-post rack and four-post rack installations.
The following table summarizes the clearance requirements for proper airflow for system cooling and regular hardware
maintenance of a AltaVault system:
Clearance requirements
Location
Value
Airflow and cooling
System front
System rear
6 inches (15.2 cm)
12 inches (30.5 cm)
Maintenance
System front
System rear
30 inches (76.2 cm)
36 inches (91.4 cm)
M o u n t th e c o n tr o lle r c h a s s is o n th e r a c k
B e c o m e fa m ilia r w ith s y s te m c o m p o n e n ts
In s ta ll th e d is k s h e lv e s o n th e r a c k
P r e p a r e th e s ite fo r in s ta lla tio n
P o w e r o n th e d is k s h e lf, th e n , th e c o n tr o lle r
S e t u p th e r a c k s
D e p lo y th e A lta V a u lt A p p lia n c e
R e v ie w th e d o c u m e n ta tio n fo r th e s y s te m
C o n n e c t th e c o n tr o lle r to th e n e tw o r k , c o m p u te r , a n d s h e lv e s
R e v ie w th e A d m in is tr a to r ’s c o n fig u r a tio n w o r k s h e e t
Содержание AltaVault Cloud Integrated Storage 4.1
Страница 2: ......