FERTIKIT 3G
INSTALLATION MANUAL
15
DESCRIPTION
Typical setup of the SP mode
FertiKit
TM
3G
13
14
15
16
17
18
19
20
21
22
16
Minimum required distances between the inlet and the fertilizer/acid outlets on the main line
A
1
A
2
A
3
Description
Required proportions
A
1
Distance between acid outlet and fertilizer outlet on the main line
Minimum 75 cm (2.5 feet)
A
2
Distances between fertilizer outlets on the main line
Minimum 30 cm (1.0 feet)
A
3
Distance between fertilizer outlet and FertiKit
TM
inlet on the main line
Minimum 90 cm (3.0 feet)
Main parts of the SP mode and infrastructure
The list below presents the main parts of the FertiKit™ SP mode and the infrastructure parts required for
its operation as depicted in the Schematic diagram and the Typical setup drawing above.
Color code:
Supplied (part of the FertiKit™), Not supplied (part of infrastructure).
1
Dosing c Venturi
2
Upper manifold pressure gauge
4
Sampling outlet
5
Controller
6
EC sensor
7
pH sensor
8
EC/pH transmitter
9
Dosing booster
10
Dosing booster switchbox
11
Check valve
12
Pressure switch
13
Fertilizer/acid stock tank
14
Manual valve (fertilizer)
15
Fertilizer/acid filter
16
Manual valve (isolation)
17
Main line
pressure sustaining valve (PSV)
18
Irrigation valve
19
Water meter
20
Main line filter
21
Main line pump
22
Main line
pressure reducing valve (PRV)