STEP LADDERS
ALLEN KEY
Tools Required:
1 0 f t
x
1 0 f t
x
1 0 f t
S O C K E T E D
C A G E
Fix the Impact Panel to the roof of the cage approximately 1ft from the back,
using the Ties provided. The panel can then be left to hang free or attached
to the side netting.
8
@NetWorldSports
PARTS
QTY
STEEL UPRIGHTS
3143mm
x4
128 3 WAY 90°
CORNER
x4
134 GROUND
SOCKET
x4
10ftx10ftx10ft
GOLF NET
x1
10ftx10ft
IMPACT PANEL
x1
TWINE &
CABLE TIES
x1 PCK
STEEL TOP
BARS 2965mm
x4
i
Always Inspect goal post and net for defects before use and repair damaged parts.
Do not use cage with faulty parts.
Never climb on the net or cage frame. The cage must never be used without the net fitted.
Please adhere to safety instructions at all times.
www.networldsports.co.uk // +44 (0) 1691 683 807 // [email protected]
www.networldsports.com // 1-866-861-9095 // [email protected]
1 0 f t
x
2 0 f t
x
1 0 f t
S O C K E T E D
C A G E
128 3 WAY
90° CORNER
TWINE CORD
LABEL
Lay out all the steelwork and connectors, checking that they match the parts list.
1
Assemble the top of the frame by attaching 4 x 128 3-Way 90° Corners to the
4 x Steel Bars 2965mm.
2
4
Insert the 134 Grounds Sockets into the ground. Sockets require
STEEL BARS
Use the top of the frame to mark the correct position of the 4 x 134
concreting into the ground with approximately 0.3m³ of concrete.
Ground Sockets.
3
Attach the 4 x Steel Uprights 3143mm to the top of the frame.
5
Insert the Steel Uprights 3143mm to the 134 Ground Sockets.
Tighten the grub screws to secure frame.
6
Tie the net onto the assembled cage frame with the Twine and Cable
Ties provided. Note: the red label indicates the front of the net.
Ensure Ties are spaced evenly.
7
134 GROUND SOCKET
PARTS
QTY
STEEL UPRIGHTS
3143mm (L)
x6
128 3 WAY 90°
CORNER
x4
134 GROUND
SOCKET
x6
10ftx10ftx10ft
GOLF NET
x2
10ftx10ft
IMPACT PANEL
x2
TWINE &
CABLE TIES
x1 PCK
STEEL TOP
BARS 2965mm
(S)
x6
STEEL CENTRE
x1
x2
176 4 way
90° Joint
BAR (M)