![Net Optics 10/100/1000 Base Tap Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/net-optics/10-100-1000-base-tap/10-100-1000-base-tap_installation-manual_1669569012.webp)
Gig Zero Delay Tap & 10/100/1000BaseT Tap
9
Connecting to the Monitoring Device
To connect the Tap to the Monitoring device:
1. Supply power to the Tap using the two redundant power supplies included
with the unit. Verify that the Power LED illuminates.
Note: _______________________________________________________________
The second power supply is available to support the flow of traffic to the
monitoring device in the event that the first power supply becomes
unavailable.
______________________________________________________________________
2. Connect Monitor Port A to the appropriate port on the monitoring device
using a CAT5e straight-through cable. This cable sends the monitoring
device a copy of all of the traffic being received at Monitor Port A.
3. Connect Monitor Port B to the appropriate port on the monitoring device
using a CAT5e straight-through cable. This cable sends the monitoring
device a copy of all of the traffic being received at Monitor Port B.
Figure 8:
Connecting to the Monitoring Device
®
www.netoptics.com
Monitor
Network
10
100
1000
LINK
ACT
1
2
Full Duplex Tap
Full Duplex Tap
A
A
B
B
To monitor NIC
To monitor NIC
Содержание 10/100/1000 Base Tap
Страница 1: ...Installation Guide for Gig Zero Delay Tap and 10 100 1000BaseT Tap 800 0150 001 Rev G PUBTPCU3ZDU 2 11...
Страница 16: ...Gig Zero Delay Tap 10 100 1000BaseT Tap 13 19 00 9 90 1 10 5 55 1 73 10 32 25 5 14 TP CU3 ZD Dimensions...
Страница 17: ...Gig Zero Delay Tap 10 100 1000BaseT Tap 14 5 55 1 10 6 40 19 00 1 73 5 14 TP CU3 Dimensions...
Страница 20: ...2011 by Net Optics Inc All Rights Reserved www netoptics com...