![Neptune TRU/FLO Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/neptune/tru-flo/tru-flo_installation-and-maintenance-manual_1668257020.webp)
8
TRU/FLO Compound Meter Installation and Maintenance Guide
4 Installing the TRU/FLO
This chapter describes storage, unpacking, and installation instructions for the TRU/FLO
meter.
Prior to Installation
Storage
Upon receipt, inspect shipping containers for damage and inspect the contents of any
damaged cartons prior to storage.
Once the inspection is complete, store the cartons in a clean, dry environment.
Unpacking
After unpacking the TRU/FLO meter, inspect it for damage. If the meter appears to be
damaged, notify your Neptune Territory Manager or Distributor. If one or more items
requires reshipment, use the original cardboard box and packing material.
Tools Needed
Table 7 on page 7 shows the recommended tools you need to successfully install the
TRU/FLO meter.
The TRU/FLO meter is heavy and needs to be handled carefully. Lift the assembly out of the box
by the meter maincase, and not by the register. Inspect the meter for damage but use caution;
the meter is very heavy.
Table 7 is not a complete list of tools.
Содержание TRU/FLO
Страница 2: ......
Страница 3: ...TRU FLO Compound Meter Installation and Maintenance Guide...
Страница 8: ...Notes Contents vi TRU FLO Compound Meter Installation and Maintenance Guide...
Страница 12: ...x TRU FLO Compound Meter Installation and Maintenance Guide Notes Tables...
Страница 42: ...Why Maintenance is Important 30 TRU FLO Compound Meter Installation and Maintenance Guide Notes...
Страница 44: ...Appendix A 32 TRU FLO Compound Meter Installation and Maintenance Guide Notes...
Страница 57: ......