INSTALLATION
Power trim plus
4-1
NEOLT
Qualification of the operator
4.1
Transport, installation and connection operations must be performed only by personnel
qualified in transportation and electrical operations.
Transport
4.2
Transport conditions
4.2.1
The trimmer is shipped with a packaging consisting of three cardboards
1
for components
protection, and of a carton box
2
containing all the components.
Fig. 5.1 Transport
conditions
.
The packaging size and its gross weight (trimmer plus packaging) are the following:
MODEL
105
145
165
210
250
Size (WxDxH - cm)
120x51x30
186x51x30
230x51x30
280x51x30
280x51x30
Weight (gross) - Kg
46
50
55
58
70
M
Please use suitable lifting devices and accessories, complying to the rules in force.
4
To avoid shocks and turnover, apply the needed care. Protect the machine against external
atmospheric agents.
Содержание Power Trim Plus 105
Страница 1: ......
Страница 14: ...INFORMATION ON SAFETY Power trim plus 2 4 NEOLT...
Страница 28: ...MAINTENANCE Power trim plus 6 2 NEOLT...
Страница 30: ...DISMALTING Power trim plus 7 2 NEOLT...
Страница 32: ...ATTACHMENTS Power trim plus 8 2 NEOLT...
Страница 34: ...OPTIONAL ROLL HOLDER Power trim plus A 2 NEOLT...
Страница 40: ...TECHNICAL SHEET REPLACEMENT OF ROTATING BLADE Power trim plus SCH TEC 4 NEOLT...
Страница 41: ......
Страница 42: ...NEOLT S p A Via G Galilei 8 24036 Ponte San Pietro BG ITALY 035 468811 035 468886 NEOLT 2003...