5
CAUTION
Power off: After cut off main power supply,pull the plug or disconnect the power cable from the
power supply.
1.When an exception or failure happens,or power failure,please terminate the operation of
Windows,and power it off.
2.Power off prior to cleaning and repairing in case of any accidents.
3.When pull the plug,please hold the head instead of wire.
Transport
1.Take necessary security measures,to prevent upside down or fall when lifting or moving.
Open
1.Please read all instruction in the wooden box
2.Do not cut the packing tape by knife,to avoid scratch the machine
3.Keep all packing material.
Installation
1.Please put the machine in a horizontal place.
2.Please keep the floor clean and dry,and the machine should be grounded, to prevent electric
shock or leakage.
Prepare work
1.Make sure the power cable no damage,no shedding and no loose.
2.Do not put hand in the working area.
Maintenance
1.Repair and calibration should be operated by skilled mechanical technician.When replacing
parts,please use the part which are supplied by NeoDen.We are not responsible for any accident
result from using nonstandard part.
2.In order to prevent electric shock caused by unskilled operation,the electrical repairs,
maintenance(including wiring),should be operated by professional electrician or the technical staff
from NeoDen or our distributors.
3.Make sure Bolts - Nuts are tighten after repair,calibration or replacing any part.
Working Environment
1.Do not use machine in a noisy environment,such as high frequency welding machine.
2.Do not use machine if the power supply voltage exceed the rated voltage ± 10%.
3.Do not use machine and pull the plug when thunder to avoid any accident caused by damaged
electrical component.