background image

11

Assembly

9

a

. Side burner (18) is assembled into the side burner shelf

 with 2 

pcs M4 screws (A). Insert the tube to valve connector.

A

18

Содержание GAS-5BURN-BBQ

Страница 1: ...ner 4 1 Gas BBQ with Gas Regulator Kit Rain Cover INSTRUCTION MANUAL GAS 5BURN BBQ For any issues please feel free to contact us we are always happy to help Email support neodirect com Telephone 01133...

Страница 2: ...PARTS Please see page 2 for detailed part list...

Страница 3: ...tions may be dangerous and will void the warranty 8 Check your gas grill annually for any leaks Check whether the hose connections are tight and leak test them each time you reconnect the gas cylinder...

Страница 4: ...2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A B M5 12 screw G M3 10 screw H M3 10 self tap screw C Top door pin D E M4 nut F M3 nut Bottom door pin 1 1 2 4 1 1 1 1 1 2 2 2 2 2 2 2 2 1 2...

Страница 5: ...o not tighten the screws and nuts until all assembly steps are completed Assembly 1 Assemble the left side and right side frame 5 6 to the bottom shelf 7 with 4pcs M5 screws B M3 10 st x 2 M3 nut x 2...

Страница 6: ...4 Assembly 2 Assemble the back shelf 9 to the frames with 4 pcs M5 screws B 9 B B...

Страница 7: ...5 Assembly 8 B B 3 Assemble the front beam 8 to the front of frames with 4pcs M5 screws B...

Страница 8: ...6 Assembly 4 Assemble the 4pcs wheels 10 11 to the end of frame legs Please note the 2pcs wheels with breaks 10 will always be on the same side...

Страница 9: ...into the frame legs with 8 pcs pre assembled M5 screws See detailed pic Tighten the screws after the body is in position Thermometer 23 is fixed to the lid using its own screw Make sure all 8pcs screw...

Страница 10: ...8 Assembly 6 Right side shelf 14 is assembled to the body with 6 pcs M5 screws B...

Страница 11: ...9 Assembly 7 Left side shelf 15 is assembled to the body with 6 pcs M5 screws B...

Страница 12: ...10 Assembly 8 Side burner rotary switch base 16 side burner front plate and side burner valve inside shelf front plate are assembled together with 2pcs M4 countersunk screws A A...

Страница 13: ...11 Assembly 9a Side burner 18 is assembled into the side burner shelf with 2 pcs M4 screws A Insert the tube to valve connector A 18...

Страница 14: ...12 Assembly 9b One end of ignition 19 is assembled to the side burner shelf with 1pc M4 screw A and 1pc M4 nut D The other end is assembled to the valve connector A...

Страница 15: ...13 Assembly NOTICE In order to succeed in lighting the side burner s make sure the ignition needle s head is direct at one of the side burner s gas holes...

Страница 16: ...14 Assembly 10 Decorated knob 17 is assembled to side burner s front plate Grate 20 is putted on side burner shelf with 3 legs slotting into the holes...

Страница 17: ...15 Assembly 11 Handles 13 are assembled to front doors 12 with 4pcs M4 screws A A...

Страница 18: ...E 16 Assembly C 12 Doors are assembled to the frames front legs with top and bottom pins C E...

Страница 19: ...17 Assembly 13 Warming grid 2 cooking grids 3 and heat tents 4 are fixed into the body...

Страница 20: ...Tighten all screws before use Assembly completed 18 Assembly 14 Oil cup 21 is assembled to the oil pan...

Отзывы: