![neno LEADX Ultra Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/neno/leadx-ultra/leadx-ultra_assembly-and-operating-instructions-manual_3953456015.webp)
NENO LEADX Ultra Manual
© NENO-CNC Schweiz 2023
Seite | 15
2.1.1 HGR rail preparation
Article Nr.
Description
Number of screws for
Y-axis length
1000MM
1500MM
1
M4 x 14mm cylinder head bolt with
hexagon socket
17
26
2
M4 sliding T-nut
17
26
3
HGR 15 rail
1
1
Insert the M4 x 14mm cylinder head screw through the HGR rail and screw the M4 sliding nut to the
other end. Half a turn on a screw is sufficient. These are tightened later.
Please note that the number of M4 x 14mm cylinder head bolts and the M4 sliding nut depends on
the machine size.
Содержание LEADX Ultra
Страница 34: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 34 2 7 2 Completed Y1 and Y2 axes Y axis Y1 Y axis Y2...
Страница 80: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 80 4 6 X axis complete...
Страница 96: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 96...
Страница 99: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 99 5 7 Z axis complete...