21
7 RS485 Network B
To set up the network, follow these steps:
1. For the connection setup between the PC and FG7 module, refer to the FG7
installer manual. The PC to FG7 link is optional to run the NEMTEK Fenceprobe
software.
2. For the FG7:
a. Disconnect the power and open the NEMTEK FG7 (Refer to the FG7 Installer
Manual).
b. Connect the GND, A and B wires coming from the DATA OUT of the previous
RS485 network device to the RS485 IN GND, A and B terminals of the FG7. [1]
c. Connect the GND, A and B wires going to the next RS485 network device to
the RS458 OUT GND, A and B terminals of the FG7. [2]
d. Configure the LINE BIAS jumper JP1 to DISABLE. [3]
e. Configure the RX EN and TX EN jumpers JP2 and JP3 to ENABLE. [4]
f. Configure the SERIAL SELECT jumper JP7 to RSXXX. [5]
g. Configure the RSXXX jumper JP8 to RS485. [6]
h. Close the FG7.
i. Power up the FG7, when all network connections have been done.
j. Configure the FG7 software by referring to the FG7 Installer Manual.
2
5
6
4
3
1
Содержание Druid LCD 2X
Страница 1: ...Network Guide For Druid LCD 2X Energizers ...