Neles PB2 Series Скачать руководство пользователя страница 6

1PB270EN - 10/2020

6

3. 

With a brush, clean body blots (15) and gland bolts (14) 

of foreign material such as paint, thread locker, grime and 

commodity. Inspect the threads for damage or defect with 

appropriate ring or plug gage. Repair any out-of-tolerance 

threads or replace in-kind.

4. 

Re-inspect all components for damage to the sealing areas, 

stem (4), body (1), and cap (2). Replace any damaged parts.

5. 

Carefully clean and polish the ball (3) sealing surface: It should 

be free of all scratches and grooves.

6.  If the ball is damaged, or scratches are present, replace the ball.
7. 

With the body cavity facing up, insert one valve seat (5) into 

the body (1) to below the stem bore. Tilt the seat into place 

and position so the proper surface will be in contact with the 

ball.

8. 

Insert the stem (4) into the body (1), and press it gently up into 

the stem.

9. 

Holding stem (4) in place from the bottom and insert the gland 

packing (7) over the stem. See

 Figure 2

 for proper V-ring 

orientation.

 

 

7

Figure 3. 

V-ring packing orientation

10. Install the gland (6), washers (13), and gland bolts (14).
11. Tighten the gland bolts (14) evenly until the gland packing (7) is 

compressed and then tighten an additional ¼ turn. Visually inspect 

to ensure the gland (6) is parallel with top of actuator mounting 

flange.
12. Rotate the stem (4) so the ball drive is in the closed position. 

Place the ball (3) into the body cavity by partially rotating and sliding 

the ball onto the stem (4) and against the seat (5). Make certain the 

stem is roughly in the middle of the ball slot.
13. Place the second seat (5) into the cap (2) in the correct
orientation so the proper surface contacts the ball.
14. Carefully place the cap (2) on top of the body (1) and loosely 

install the body nuts (16). Lightly lubricate bolts and face of nut with 

anti-seize grease. Tighten the body nuts in an alternating sequence 

across the body, gradually increasing the tightening torque in 

multiple steps to applicable torque from 

Table 1

.

Table 1
Valve Size

Spec of Bolt holes

Bolt torque Nm 0...+30%

NPS

 1/2

M12 x 4 

15

 3/4

M12 x 4 

15

1

M12 x 4 

15

1 1/2

M16 x 4 

44

2

M16 x 4 

49

2.5

M16 x 4 

53

3

M16 x 8 

53

4

M16 x 8

104

6

M20 x 8

137

10.  After fully tightening the gland packing and body joint flange, 

operate valve to verify smooth operation during opening and 

closing.

11.  If the actuator was removed, reinstall and set the actuator 

stops as described in the 

ACTUATOR MOUNTING 

INSTRUCTIONS

 Section. 

4.6 TESTING THE VALVE 

WARNING: 

WHEN PRESSURE TESTING, EXERCISE CAUTION 

AND MAKE SURE ALL EQUIPMENT USED IS IN GOOD 

WORKING CONDITION AND APPROPRIATE FOR THE 

INTENDED PRESSURE.

If the valve is to be tested prior to returning to service, make sure 

the test pressures are in accordance with an applicable standard.
When testing the valve for external tightness, keep the ball in the 

half open position.
If testing for seat tightness, please contact Neles for advice.

WARNING: 

WHEN PERFORMING ANY TESTS, NEVER EXCEED 

THE MAXIMUM OPERATING PRESSURE OR MAXIMUM 

SHUT-OFF PRESSURE LISTED ON THE IDENTIFICATION 

PLATE.

Содержание PB2 Series

Страница 1: ...Neles PB2 series full bore flange PFA lined ball valve NPS 1 2 6 Installation maintenance and operating instructions 1PB270EN 10 2020...

Страница 2: ...ck cover Table of contents GENERAL 3 Scope of the Manual 3 Valve markings 3 Safety Precautions 3 Technical Specification 3 TRANSPORTATION AND STORAGE 4 INSTALLATION 4 General 4 Installing in the Pipel...

Страница 3: ...ERIALS HAVE PRESSURE RATINGS THAT ARE LESS THAN THE BODY RATING ALL OF THE BODY AND SEAT RATINGS ARE DEPENDENT ON VALVE TYPE AND SEAT MATERIAL DO NOT EXCEED THESE RATINGS WARNING BEWARE OF BALL MOVEME...

Страница 4: ...there is seepage past the gland packing upon installation it means the valve may have been subject to wide temperature variations in shipment Leak tight performance will be restored by a simple stem s...

Страница 5: ...s 3 Lift the actuator straight up in line with the valve stem until the connection between actuator drive and valve stem is completely disengaged 4 Place actuator in a safe location to avoid damage or...

Страница 6: ...ball onto the stem 4 and against the seat 5 Make certain the stem is roughly in the middle of the ball slot 13 Place the second seat 5 into the cap 2 in the correct orientation so the proper surface...

Страница 7: ...nted the valve position should correspond to the indicated actuator position 2 Assemble actuator onto the valve ensuring full engagement between the stem and actuator drive and the actuator fully cont...

Страница 8: ...Ball ASTM A351 CF8 PFA or ASTM A276 304 PFA 4 Stem ASTM A276 304 PFA 5 Seat TFM 1600 6 Gland ASTM A351 CF8 7 Gland packing PTFE 8 Handle ASTM A216 WCB ASTM A351 CF8 9 Stop plate ASTM A276 304 10 Washe...

Страница 9: ...ody Ball Stem S4 CF8 PFA 304 PFA 304 PFA D2 DI PFA 304 PFA 304 PFA 6 sign Material of seat Z TFM 1600 7 sign Packing material T PTFE Live loaded packing 8 sign Version A Model A NOTE As the use of the...

Страница 10: ...1PB270EN 10 2020 10...

Страница 11: ...11 1PB270EN 10 2020...

Страница 12: ...151 neles com Subject to change without prior notice Neles Jamesbury and Easyflow by Neles and certain other trademarks are either registered trademarks or trademarks of Neles Corporation or its subsi...

Отзывы: