en
Installation instructions
14
Preparing the wall
Note:
Depending on the design, holes must be placed
differently. Before installing, pay attention to the design
of the extractor hood.
1.
Ensure that there are no electrical wires, gas pipes
or water pipes in the area where holes are to be
drilled.
2.
Mark a vertical centre line on the wall from the ceil-
ing to the lower edge of the appliance.
3.
Mark the positions for the screws and the contour of
the attachment area.
4.
Drill 8 mm diameter holes to a depth of 80 mm and
press in the wall plugs flush with the wall.
5.
Screw on the retaining bracket for the flue duct.
6.
Screw in 2 securing screws with washers to approx.
5 mm.