Issue 2.0
4-88
Installing the SV9100 Blades
Basic Support Package
Each blade installed with the PVA PMS
accounts for up to 16 Extension
Ports of the Total Port capacity (One PVA PMS
blade maximum). Each
CCISoIP package can be licensed for up to 24 ports and counts towards
total trunk port capacity.
Refer to the following tables for maximum upgrade capacities of the
GCD-PVAA blade:
Table 2-6 SV9100 Maximum 9.5” Gateway and 19” System
Capacities – Blades on page 2-12
Table 2-7 SV9100 Maximum 9.5” Base and Expansion System
Capacities – Blades on page 2-14
6.2.2
Installation
To install the GCD-PVAA:
Install CompactFlash on GCD-PVAA
Plug the blade into any universal slot on the chassis
Refer to Program 10-55-01 to configure the IP Address of the
GCD-PVAA
Refer to Program 10-55-04 to configure the Subnet Mask of the
GCD-PVAA
Refer to Program 10-55-05 to configure the Gateway of the
GCD-PVAA
The GCD-PVAA blade is hot swappable and can be removed from
the chassis without powering down the blade or the SV9100 system
When the SV9100 requires system reset, this blade comes back on
line
6.2.3
Switch Settings
The GCD-PVAA blade has the following switches:
Reset Switch SW3
This switch allows the technician to reset the GCD-PVAA without
having to remove and reinsert the blade into the chassis.
Содержание Univerge SV9100
Страница 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Страница 22: ...xviii Table of Contents Issue 2 0...
Страница 42: ...xxxviii List of Tables Issue 2 0...
Страница 72: ...Issue 2 0 1 18 Introduction to SV9100...
Страница 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Страница 162: ...Issue 2 0 3 40 Installing the SV9100 Chassis Figure 3 47 Install Wall Mount Brackets with Screws...
Страница 166: ...Issue 2 0 3 44 Installing the SV9100 Chassis Figure 3 51 Attach Cable Support Bracket to Lower Wall Mount Bracket...
Страница 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Страница 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Страница 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Страница 270: ...Issue 2 0 4 32 Installing the SV9100 Blades Figure 4 13 Connecting an IPLE Daughter Board to a Network PC...
Страница 312: ...Issue 2 0 4 74 Installing the SV9100 Blades 5 7 GCD 4ODTB 4 Port Tie Line Interface Blade Figure 4 27 GCD 4ODTB Blade...
Страница 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Страница 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Страница 396: ...Issue 2 0 5 54 Installing DT Series Digital and IP Multiline Terminals Figure 5 46 Removing the DESI Sheet DESI Sheet...
Страница 412: ...Issue 2 0 5 70 Installing DT Series Digital and IP Multiline Terminals Figure 5 65 Sticker Braille L KIT Sheet 2...
Страница 455: ...Issue 2 0 SV9100 System Hardware Manual 6 5 Figure 6 2 Bluetooth Handset Controls and Indicators...
Страница 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Страница 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Страница 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Страница 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Страница 541: ...Issue 2 0 SV9100 System Hardware Manual 7 65 13 3 Location of Controls Figure 7 72 IP Doorphone Controls...
Страница 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...