
8.
Connect the VOIPDB-C1 to an Switching hub using an LAN Cable.
The LAN Cable must pass two times (two rounds) through the Ferrite Core as below. (Ferrite
Core is attached with VOIPDB-C1)
VOIPDB-C1 board (CN1)
Ferrite Core
VOIP
to HUB
LAN Cable
30 - 50 mm
(1.181 - 1.967)
Pass 2 times
< Bottom View >
Figure 2-96 Connecting a LAN Cable
9.
Refer to the SL Programming Manual for detailed programming instructions.
The VoIP feature requires system configuration.
For the details of setting and operation, refer to the SL Features & Specifications Manual
(separate issue).
4.2.4 LED Indication
LED indications for the IP4WW-VOIPDB-C1 are listed
Table 2-19 VOIPDB LED Indications on
. Each LED is listed with its associated function and operational status.
VOIPDB-C1
board
LINK10
LINK100
LINK1000
ACT
< Bottom View >
Figure 2-97 Location of LEDs
ISSUE 3.0
SL1000
Hardware Manual
2-67
Содержание SL1000
Страница 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Страница 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Страница 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Страница 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Страница 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...
Страница 149: ...MEMO ISSUE 3 0 SL1000 Hardware Manual 5 9...
Страница 150: ...Hardware Manual NEC Corporation ISSUE 3 0...