1.2.1 Perform a Cold Start
This section describes the process for starting the system for the first time or starting a system that
requires the customer data be deleted.
System software is loaded from flash memory, and the customer data is deleted
from RAM memory.
If Expansion KSU(s) are installed, turn the power on/off in the order of
Expansion 3 KSU, Expansion 2 KSU, Expansion 1 KSU and then Main KSU.
To perform a Cold Start;
1.
Set the power switch to off position.
Figure 3-2 Power Switch Location
2.
Open the Sub-Cover on the Main KSU and identify the
LOAD
button (S1) location on the CPU
card.
Sub-Cover
Tab
< Front view >
S1
LOAD
CPU card
Tab
Figure 3-3 Load Button (S1) Location
3.
Once the system has powered off, push in and hold the
LOAD
button (S1).
If Expansion KSU(s) are installed, the Power Switch must be ON at
Expansion KSU(s).
SL1000
ISSUE 3.0
3-2
System Start Up
Содержание SL1000
Страница 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Страница 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Страница 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Страница 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Страница 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...
Страница 149: ...MEMO ISSUE 3 0 SL1000 Hardware Manual 5 9...
Страница 150: ...Hardware Manual NEC Corporation ISSUE 3 0...