
Installation Guide
QX-S5500G Series Ethernet Switches
3-17
Figure 3-19
Installing a power module
NOTE:
If the power module slot where you want to install a power module is covered by a filler
panel, remove the filler panel first.
When necessary power supply module is one, please insert power supply module in
power supply module slot 1. Then insert a filler panel in power supply module slot 2.
Removing the filler panel:
Loosen the captive screws of the power module with a Phillips screwdriver until they
are completely disengaged.
Put a flat screwdriver in central prominence of a filler panel, please so as not to
damage. And remove a filler panel. Please keep a filler panel in the purpose when
using it next time.
Figure 3-20
Removing the filler panel
1
2
1