
User Manual
NEC Digital Signage Software
Version 2.3
User Manual
V1.0 v. 06.05.09
2009 NEC Display Solutions
–
all rights reserved
Seite
22
von
29
2.10 Sending
Content Projects
In order to send the active Content Project to the connected NEC Player Systems click in the left icon
bar on
Send
or choose in the menu bar under
File
the function
Send
. If the active
Content Project
has
not been saved, a saving dialogue box will appear first. (Cp. Chapter 2.9).
After saving, a sending Dialogue opens. Here, the NEC Player Systems with attached NEC Displays
are listed and can be selected via a checkbox. Now the playtime on all selected NEC Player
Systems is chosen (See next Chapter).
Notice
: For easier reference and orientation you can rename the NEC Player Systems via the button
Rename Displays here.
The sending of the Content Projects to the attached NEC Player Systems starts with a click on the
button
Send
. In order to being able to send, the Editor PC and the Player PC have to be connected
via a local network.
During sending only new or not previously transferred content is sent to the NEC Player Systems
(incremental update). To all data a checksum is added in order to verify the transfer. Via the progress
bar (
current file
and
complete project
) the progress of the transfer is shown graphically for the single
Content Elements as well as the whole Content Project.
Immediately after the successful transfer or at a predefined playtime the respective NEC Player
Systems starts with the playing of the Content Project as Content Loop.
Notice:
Please note that the first display of a
Channel Services (Cp. Chapter 2.3) auf den NEC Player
Systems may take up to 30 minutes time. All other Content Elements of the Content Projects are
displayed correctly.