NC1600C
2. Setting Up Your Projector
D-23
2.3
Connecting the power cable
Connect the power cable of the projector. The AC power cable is not attached as an
accessory. Be sure to have professional technicians do any power supply construction.
Warning
•
Carefully read the contents described in this section before connection and
connect the cables according to the proper procedure. Inappropriate handling
may cause fatal, serious or other bodily injuries due to fire or electric shock.
Caution
•
Before connecting the power cables, check that the main power switches of the
projector is turned off. Implement the connection with AC power shut off.
•
Entrust a specialist to carry out the power supply work from the power supply
equipment of the building to the place of projector installation.
•
Be sure to ground the equipment to ensure safety. To avoid electric shock,
request a professional to carry out the grounding and related works.
Make sure to ground the equipment before supply of the AC power.
2.3.1
Power supply construction specifications
Caution
•
Be sure to follow the contents described in this section.
•
Be sure to have professional technicians do any power supply construction
from the power supply equipment of the building to the projection installation
location.
AC power supply
equipment
- Do not connect AC power supply voltages to the projector other than those indicated below.
200 - 240 Vac, single phase, 50/60 Hz
Breakers
- When connecting the AC power supply from the power supply equipment of the building to
the projector, be sure to connect it through a breaker. The capacity of the breaker must be
as indicated below.
30A
Breaker
Projector
(Main unit)
AC power supply cable
AC power supply
equipment