Navini ripwave Скачать руководство пользователя страница 1

 

 

 
 
 
 
 

 
 

 

 
 
 
 

Ripwave

 Base Station  

 

Installation & Commissioning Guide

 

 
 
 
 

 

 
 
 
 
 
 

 

 
 
 
 
 
 

Part Number 40-00047-00 

Revision D, Version 1.0 

February 28, 2003 

 

Proprietary 

All information disclosed by this document is the proprietary property of Navini Networks, Inc. and is protected by 

copyright, trademark, and/or trade secret laws. All rights therein are expressly reserved.

 

Содержание ripwave

Страница 1: ...40 00047 00 Revision D Version 1 0 February 28 2003 Proprietary All information disclosed by this document is the proprietary property of Navini Networks Inc and is protected by copyright trademark a...

Страница 2: ...A Prepare for release 1 16 9 3 02 C 1 0 Same S Redfoot Review comments from class 8 30 02 9 27 02 C 1 0 Same Same Preliminary Commercial Release 1 18 10 18 02 C 1 0 Same Same Feedback on forms and sp...

Страница 3: ...trieval systems without the express written permission of Navini Networks Inc Navini Networks Internet at the Speed of Thought zero install unwired by Navini the Navini Networks logo and Ripwave are t...

Страница 4: ...HAPTER 2 INSTALLATION 39 PRE INSTALLATION 39 INSTALL POWER GROUNDING 42 INSTALL CABLES 45 INSTALL THE BTS 50 INSTALL GPS ANTENNAS 55 INSTALL THE RFS 58 VERIFY INSTALLED CIRCUIT CARDS 69 BASE STATION I...

Страница 5: ...BRATION VERIFICATION 175 APPENDIX G DRIVE STUDY 183 APPENDIX H LOCATION FTP TESTS 188 APPENDIX I CUSTOMER ACCEPTANCE 195 APPENDIX J OUTDOOR ENCLOSURES 197 APPENDIX K INSTALL CONNECTORS ON CABLES 213 A...

Страница 6: ...ll warnings and instructions that come with the equipment 2 Do not use the equipment while you are in a bathtub shower pool or spa Exposure of the equipment to water could cause severe electrical shoc...

Страница 7: ...equipment damage or electrical shock Only an authorized repair technician should service this product 12 Do not expose the equipment to extreme hot or cold temperatures 13 Do not use the equipment un...

Страница 8: ...tion against harmful interference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed or used in accordance with the instructions ma...

Страница 9: ...ttery contains substances that are toxic corrosive or harmful to humans If battery substances come in contact with the skin seek medical help immediately 4 Do not attempt to recharge the battery by an...

Страница 10: ...and received by many devices BS Base Station Network Access equipment and software that transmits and receives as well as processes voice or data calls from mobile units to network connections A Ripw...

Страница 11: ...ent A standard for Network Management Systems that allows integration with NMS regardless of programming language or Operating System CPE Customer Premise Equipment Communications equipment that resid...

Страница 12: ...illion 1 000 000 000 hertz cycles per second Ultra high frequency UHF signals including microwave signals GPS Global Positioning System A constellation of 24 well spaced satellites that orbit the eart...

Страница 13: ...Control MAC protocol It provides the basis for an unacknowledged connectionless service on a LAN i e error correction multiplexing broadcasting LOS Line of sight Describes laser microwave RF and infra...

Страница 14: ...ket Data Unit or Protocol Data Unit A data packet Refers to that which is exchanged between peer layer entities Contains header data and trailer information Ping Ping Generalized term from sonar scien...

Страница 15: ...eply protocol for managing TCP IP networks A device is said to be SNMP compatible if it can be monitored or controlled using SNMP messages SNR Signal to noise Ratio Related to RSSI a measurement of th...

Страница 16: ...up of Virtual Channel Links which carry data between two end points in an ATM network VCI Virtual Channel Identifier A 16 bit value in the ATM cell header that provides a unique identifier for the Vir...

Страница 17: ...ROUND BAR 24VDC 60A CABINET GND PSX GROUND BAR NAVINI BTS ETHERNET TELCO 24VDC 60A CABINET GND OPTION 2 OUTDOOR BTS Note The illustration shows both an outdoor and an indoor BTS but only one panel ant...

Страница 18: ...00 MS Word pdf Spanish 40 00096 00 MS Word pdf Ripwave Modem User Guide 40 00111 00 MS Word pdf English 40 00097 00 MS Word pdf Spanish 40 00099 00 MS Word pdf Ripwave Modem Software Update Tool Guid...

Страница 19: ...what to complete the I C activities If requested by the customer Navini may provide personnel procedures forms and or tools required to install and commission the Base Station equipment They may also...

Страница 20: ...ge prediction map 5 Perform Network Architecture design 1 Complete Project Plan for customer Site Engineering Appendix B Site Candidate Evaluation Form End Sample BoM provided in Appendix P 3 Conduct...

Страница 21: ...heet test data collected from the BTS RFS equipment shipped Verify all equipment arrived the test data is available serial numbers match paperwork Keep as part of customer site records 3 Install sweep...

Страница 22: ...and the RFS serial numbers on the RFS System Test Form A B Appendix D Base Station Installation Certification Form 9 Install verify DC input power source to BTS 10 Install GPS antennas 16 If required...

Страница 23: ...red results equipment inventory to customer on site End 18 Go over results using forms get customer sign off on Installation using Base Station Site Installation Form B 17 Provide printed package of m...

Страница 24: ...system troubleshooting procedures No Yes A Commissioning Appendix E Configuration Data Forms 4 Enter the RFS configuration by running the RFS script that shipped with the antenna eqpt 5 Verify all ca...

Страница 25: ...ting procedures No Yes A 13 Perform local over the air OTA CPE test 12 Wireline CPE test pass No Yes 14 OTA CPE test pass No Yes B Appendix F Base Station Calibration Verification Form 11b Perform loc...

Страница 26: ...nnectivity 15 Test EMS used No Yes 16 Install configure the customer EMS Server Client Connect to the BTS B D C 18 Perform calibration Ensure successful results 3 times 17 Verify EMS Server BTS connec...

Страница 27: ...FTP Test Form NOTE Step 19 is performed only if no RF plot is available 21 Perform preliminary NLOS Location FTP testing Perform 3 uploads 3 downloads at 3 locations Record results on the FTP Test For...

Страница 28: ...full LOS Location FTP testing Record results E Appendix I Customer Acceptance Form 24b Perform full Drive Study record results on the Drive Study Form This is used for tuning the model 28 Verify syste...

Страница 29: ...Split The Combo Chassis is used primarily with 2 4 GHz systems The Split Chasses is used for all other 2 3 2 5 2 6 GHz systems Figure 3 The chassis is compartmentalized into two sections the RF shelf...

Страница 30: ...ees The antenna can be used as a single mode antenna or it can be used in a group of two or three sectored antennas covering 240 and 360 degrees respectively Each panel requires a BTS to operate For e...

Страница 31: ...ith each Base Station A GPS antenna works with a constellation of satellites that orbit the earth and it provides the ability to pinpoint geographical locations The two types of GPS antennas that may...

Страница 32: ...23 inch racks Rack adapters are needed to mount the equipment in a standard 23 inch rack For outdoor BTS s the customer can supply any standard enclosure from a multitude of vendors Appendix J offers...

Страница 33: ...ng Heat Dissipation The combo BTS chassis under normal operating conditions will dissipate a maximum of 1000 Watts or 3415 BTU s The split chassis will dissipate a maximum of 1500 watts Airflow Fresh...

Страница 34: ...al or 120 degree Sectored Backhaul Interfaces 10 100 BaseT Ethernet or ATM over T1 up to 8 T1 s with or without IMA long haul support Bandwidth Allocation Dynamic Baseband Modulation Uplink QAM4 Beamf...

Страница 35: ...n Duplexing TDD Humidity 0 to 95 non condensing Mechanical Dimensions Digital H19 2 X W19 0 X D12 9 add 1 3 to D with modules installed RF H14 0 X W19 0 XD15 2 add 1 5 to D with modules installed Mult...

Страница 36: ...5 x 3 8 2 hole lug MTS 2 Kits Grounding Kit 1 2 RF 1 2 Ground Kit RF 1 2 2 hole lug NK Cables Universal Grounding kits Universal grounding kit 3 with 3 8 2 hole lug MTS ANTENNA SYSTEM RFS Antenna Omn...

Страница 37: ...TON TIMES 8 Pcs ENTRY PORT SYSTEM Goose Neck J type Hood entry TBD Feed Thru Entry Panel TBD Boot Assembly Kits Boot Assembly Kit 4 w 4 holes LMR 600 MTS 4 Kits BTS SYSTEM Ripwave 2400 BTS Navini BTS...

Страница 38: ...Ripwave Base Station I C Guide Navini Networks Inc 38 Part 40 00047 00 Rev D v1 0 February 28 2003...

Страница 39: ...nalyzed at each site in order to predict what range of coverage can be expected from installing a Base Station at the site Coverage predictions account for both Base Station performance as well as Mar...

Страница 40: ...ials BoM the actual equipment order to be manufactured and shipped to the installation site Navini can provide part numbers and ordering information as well as recommendations and other details that w...

Страница 41: ...ound NOTE The installation procedures which begin next follow the same order as shown in the I C Flowchart in Figure 2 An example of a Base Station drawing for a particular site is provided in Appendi...

Страница 42: ...to both sides of the system ground buss bar to ensure proper connection between it and the surge protectors Figure 7 Data Power Cable Surge Protector To install the eight 8 antenna and one 1 cal cable...

Страница 43: ...etworks Inc Ripwave Base Station I C Guide Part 40 00047 00 Rev D v1 0 43 February 28 2003 Figure 8 Antenna Cal Cable Surge Protector Figure 9 GPS Cable Surge Protector Figure 10 Surge Protectors in B...

Страница 44: ...s bars may be installed per system Figure 11 Buss Bars System Ground Wiring A minimum 6 stranded copper green coated wire and grounding hardware are used for ground connections Install the system grou...

Страница 45: ...3 2 1 7 18 30 95 70 01 SYN 2 5 39 38 3 0 6 0 0 3 2 1 7 20 35 95 75 2 6 EF GH 39 38 3 0 6 0 0 3 2 1 7 20 35 95 75 2 6 EF 37 35 3 0 4 5 0 3 2 1 7 20 35 95 75 05 SYN Channel filter for 2 5 2 6 or Block F...

Страница 46: ...r to the CAL connector on the back of the BTS Leave enough extra cable length for service Cut a piece of LMR 400 cable to connect each of the GPS antennas to the surge protectors on the system ground...

Страница 47: ...s can be found in Appendix K For reference Appendix L also provides a list of vendors who can make cables Sweep Individual Cables Sweep each individual cable the RFS 8 and CAL main feeder and jumper c...

Страница 48: ...rge protector Also connect all the jumper cables to the surge protectors that will attach to the BTS Do not connect these cables to the BTS at this time Torque all the cable connectors to the surge pr...

Страница 49: ...ev D v1 0 49 February 28 2003 Figure 15 Omni Cable Routing Figure 16 Panel Cable Routing Calibration Cable Calibration Cable RF Cables RF Cables Data Power Cable Data Power Cable Data Power Cable Cali...

Страница 50: ...BTS mounting rack Figure 17 or enclosure is to be installed in compliance with applicable portions of the National Electrical Code NEC articles 800 and 810 You will need to adhere to local installati...

Отзывы: