
Page 13
PROCEDURE - SA
1.
Use an 8mm allen key to secure two (2) nut
plates to each corner sleeve using four (4)
pieces each of the M12 flat washer and M12
x 30mm button head cap screw
- DO NOT
FULLY TIGHTEN.
2.
Repeat Step 1 to build a total of four (4)
corner sleeve assemblies.
x4
Fig. 27
3.
Install a corner sleeve assembly built in Steps
1+2 onto one end of each of the front tube
weldments, then use an 8mm allen key to
tighten the hardware to secure the corner
sleeve to the front tube weldments.
4.
Repeat Step 3 to build a total of four (4)corner
sleeve assemblies attached to front tube
weldments.
x2
Fig. 28
5.
Use an 8mm allen key to secure two (2) nut
plates to each front sleeve using four (4)
pieces each of the M12 flat washer and M12
x 30mm button head cap screw
- DO NOT
FULLY TIGHTEN.
6.
Repeat Step 5 to build a total of two (2) front
sleeve assemblies.
x2
Fig. 29