Service Manual Chapter7. Cash Dispenser Unit
© 2013
Nautilus Hyosung Inc.
All Rights Reserved.
7-39
Gate Solenoid Assembly
► Gate Solenoid Assembly
1. Remove the solenoid power cable.
2. Loosen the solenoid bracket M4 fixing screw (2 places).
3. Loosen the solenoid M3 fixing screw (3 places).
4. Remove the solenoid assembly and replace it.
5. Assemble in the order of 4~1. Adjust the gate according to the adjustment standard.