![Nautel NX5 AM Скачать руководство пользователя страница 215](http://html1.mh-extra.com/html/nautel/nx5-am/nx5-am_operation-and-maintenance-manual_711218215.webp)
NX5 OPERATION & MAINTENANCE MANUAL
ROUTINE MAINTENANCE
VERSION 0.1 2015-08-01
PAGE 3.3.11
Inspecting Lightning Protection Systems
You should inspect the lightning protection systems that are connected to your NX5 transmitter, ac
power, RF feedline, antenna and tower periodically to ensure that your site, equipment and personnel
are fully protected.
Interval
Every 6 months.
Parts and Tools
Depends on your site, but may include a DVM, ladder, binoculars, and continuity tester.
Procedure
Perform the following steps to test the lightning protection systems:
1.
Test the continuity between ground available at your lightning arrestor and ground available on
various pieces of equipment connected to the transmitter. Ensure that there is no resistance (0
ohms).
2.
Physically inspect the lightning arrestor to ensure that all connections are tight. Also look for any
sign of scoring or burning (indications of possible damage from earlier lightning strikes).
3.
Using binoculars, visually inspect the hardware on the tower. Look for charred, broken or frayed
connections and corrosion.
Содержание NX5 AM
Страница 2: ......
Страница 4: ......
Страница 8: ...NX5 OPERATION MAINTENANCE MANUAL PAGE 3 VIII VERSION 0 1 2015 08 01 ...
Страница 216: ...NX5 OPERATION MAINTENANCE MANUAL ROUTINE MAINTENANCE PAGE 3 3 12 VERSION 0 1 2015 08 01 ...
Страница 219: ......