GV20/GV15 INSTALLATION MANUAL
COMMISSIONING
VERSION 5.0 2021-03-01
PAGE 2.9.1
SECTION 2.9: COMMISSIONING
The transmitter contains solid-state devices that may be damaged if subjected to excessive heat or
high-voltage transients. Ensure that circuits are not overdriven or disconnected from their loads while
turned on.
The transmitter was precisely calibrated and tested during manufacturing. Do not change any
adjustments other than those specified.
This section contains the following procedures:
•
Pre-Commissioning Tasks - see page 2.9.2
•
Commissioning - see page 2.9.3
–
Turning on the Transmitter - see page 2.9.3
–
•
Network Setup - see page 2.9.5
•
Configuring an External UPS - see page 2.9.7
WARNING! Before applying ac power and turning on the transmitter, you
must customize some circuits to the station's power source and operating
requirements. Do not perform this pre-commissioning unless you are a
station engineer or a competent electronics technician.
Содержание GV20
Страница 2: ......
Страница 4: ......
Страница 8: ...GV20 GV15 INSTALLATION MANUAL PAGE 2 VIII VERSION 5 0 2021 03 01...
Страница 18: ...GV20 GV15 INSTALLATION MANUAL UNPACKING AND POSITIONING PAGE 2 2 8 VERSION 5 0 2021 03 01...
Страница 24: ...GV20 GV15 INSTALLATION MANUAL INSTALLING OPTIONS PAGE 2 3 6 VERSION 5 0 2021 03 01...
Страница 36: ...GV20 GV15 INSTALLATION MANUAL INSTALLING PROGRAM INPUTS PAGE 2 7 4 VERSION 5 0 2021 03 01...
Страница 42: ...GV20 GV15 INSTALLATION MANUAL INSTALLING CONTROL MONITOR WIRING PAGE 2 8 6 VERSION 5 0 2021 03 01...
Страница 50: ...GV20 GV15 INSTALLATION MANUAL COMMISSIONING PAGE 2 9 8 VERSION 5 0 2021 03 01...
Страница 54: ...GV20 GV15 INSTALLATION MANUAL PARTS AND TOOLS PAGE 2 10 4 VERSION 5 0 2021 03 01...
Страница 64: ...GV20 GV15 INSTALLATION MANUAL LIST OF TERMS PAGE 2 12 2 VERSION 5 0 2021 03 01...
Страница 65: ......