National Instruments 9211 Скачать руководство пользователя страница 3

NI 9211 Calibration Procedure

|

© National Instruments Corporation

|

3

Test Conditions

The following setup and environmental conditions are required to ensure the NI 9211 meets 
published specifications.

Keep connections to the NI 9211 as short as possible. Long cables and wires act as 
antennae, picking up extra noise that can affect measurements.

Verify that all connections to the NI 9211 are secure.

Use shielded copper wire for all cable connections to the NI 9211. Use twisted-pairs wire 
to eliminate noise and thermal offsets.

Maintain an ambient temperature of 23 °C ±5 °C.

Keep relative humidity below 80%.

Allow a warm-up time of at least 10 minutes to ensure that the NI 9211 measurement 
circuitry is at a stable operating temperature.

Initial Setup

Complete the following steps to set up the NI 9211.
1.

Install NI-DAQmx.

2.

Make sure the NI cDAQ-9178 power source is not connected.

3.

Connect the NI cDAQ-9178 to the system safety ground.
a.

Attach a ring lug to a 14 AWG (1.6 mm) wire.

b.

Connect the ring lug to the ground terminal on the side of the NI cDAQ-9178 using 
the ground screw.

c.

Attach the other end of the wire to the system safety ground.

4.

Install the module in slot 8 of the NI cDAQ-9178 chassis. Leave slots 1 through 7 of the 
NI cDAQ-9178 chassis empty.

5.

Connect the NI cDAQ-9178 chassis to your host computer.

6.

Connect the power source to the NI cDAQ-9178 chassis.

7.

Launch Measurement & Automation Explorer (MAX).

8.

Right-click the device name and select 

Self-Test

 to ensure that the module is working 

properly.

Verification

The following performance verification procedure describes the sequence of operation and test 
points required to verify the NI 9211 and assumes that adequate traceable uncertainties are 
available for the calibration references.

Содержание 9211

Страница 1: ...erification 3 Accuracy Verification 4 Adjustment 5 Accuracy Adjustment 5 EEPROM Update 6 Re Verification 6 Accuracy Under Calibration Conditions 6 Where to Go for Support 7 Software Calibrating the NI...

Страница 2: ...c information specifications and calibration interval NI DAQmx Readme Operating system and application software support in NI DAQmx LabVIEW Help LabVIEW programming concepts and reference information...

Страница 3: ...set up the NI 9211 1 Install NI DAQmx 2 Make sure the NI cDAQ 9178 power source is not connected 3 Connect the NI cDAQ 9178 to the system safety ground a Attach a ring lug to a 14 AWG 1 6 mm wire b C...

Страница 4: ...and average samples a Create and configure an AI voltage channel according to Table 2 b Configure the AI voltage channel timing according to Table 3 c Start the task d Read samples from the NI 9211 e...

Страница 5: ...of the NI 9211 1 Set the calibrator to Standby mode STBY 2 Connect the NI 9211 to the calibrator as shown in Figure 1 3 Set the calibrator output to 0 07 V 4 Set the calibrator to Operate mode OPR 5 A...

Страница 6: ...adjustment verify that you have met the Test Conditions before returning your device to NI Refer to Where to Go for Support for assistance in returning the device to NI Accuracy Under Calibration Cond...

Страница 7: ...de compliance policy and how to obtain relevant HTS codes ECCNs and other import export data Where to Go for Support The National Instruments Web site is your complete resource for technical support A...

Отзывы: