background image

Installation Guide Modbus E5000 IAQ probe 

 

page 3/8 

 

1. Security 

 

WARNING

 

Danger of death, risk of electric shock and fire! 
The installation should only be undertaken by a qualified electrician! 
 
To apply for correct  bus  and power cables  and to  activate the device, comply  with  the state of the art 
and standards. 
 
Any intervention or modification to the device will invalidate any warranty claim. 
 
• Do not use this probe in environments with regular exposure to silicon vapors (HMDS) because this 
gradually alters the sensitivity of the VOC sensor.  
• Do not use the sensors for measuring gas content relating to safety! 
• Use the probe only with secured low voltages! 
 

2. Positioning 

The  position  of  the  probe  is  crucial  vis-à-vis  efficiency  and  energy  savings  for 
ventilation, heating and cooling. 
 
•  The  probe  is  designed  to  ensure  air  quality;  it  must  be  placed  in  the  area  of 
occupancy  of  the  premise  served  by  outlet  vents,  on  a  wall  at  eyes  level 
(breathing human level, between 1.5 and 1.8m). 

 
• Avoid drafts (near openings, blowing air, doors, outlet vents) and dead zones 
(niche, shelves and curtains). 
 
• Avoid orthogonal walls (corners of room in particular) 
 

•  Avoid  heat  sources  and  the  proximity  of  occupants  (radius  of  1  m  from 
workstation). 
 
 
• Position the probe vertically on a wall or partition. 
This device is not intended for installation in duct or ceilings. 
 
• Avoid direct exposure to sunlight. Consider all seasons sun positions  
 
• The measurement of luminous intensity is mainly intended for the measurement of scattered light. This 
is what corresponds to the perception of our eyes. The positioning of the probe must take into account 
the quality of the desired measurement. 

Содержание LoRa EP5000L

Страница 1: ... 0 1 41 41 00 02 www nano sense com page 1 8 EP5000L air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update V3 09 07 2021 Disassembling the front panel V4 10 10 2021 Add recommendations and warranty ...

Страница 2: ... POSITIONING 3 3 DISASSEMBLING THE FRONT PANEL 5 4 FLUSH MOUNTING 5 5 SURFACE BOX MOUNTING RENOVATION 5 6 WIRING 5 7 INSTALLATION 6 8 CONNECTIONS 6 9 POWER ON 6 10 NFC 7 11 REMOVING THE FRONT PANEL OF AN INSTALLED PROBE 7 12 DISCONNECTION 8 13 RECOMMENDATIONS 8 14 WARRANTY 8 ...

Страница 3: ...ency and energy savings for ventilation heating and cooling The probe is designed to ensure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m Avoid drafts near openings blowing air doors outlet vents and dead zones niche shelves and curtains Avoid orthogonal walls corners of room in partic...

Страница 4: ...ight combine without even taking into account the generally zenithal artificial lighting Consideration should also be given to the receptivity of the light sensor which is mounted vertically similar to our eyes Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Страница 5: ...m space free up to the bottom The space between screws shall be 60mm The height of the screws heads shall be 2mm max 5 Surface box mounting renovation Use the specific wall surface box To be ordered separately This box has 4 pre cut cable passages one on each side for wiring under trunking In case of a recessed cable the bottom of the box has a pre cut central pad Fix the box to the wall with four...

Страница 6: ...ds flexible or rigid into the connector In case of a multi strand cable make sure to well twist them before inserting them In case of difficulty push the release tab Respect the polarity non destructive Make sure to respect the Up marking otherwise the temperature and humidity measurement will be jammed Screw the plate on the backbox Plug the front panel onto the plate Pay attention to the positio...

Страница 7: ...llowed by 8 yellow flashes 8 Power supply board Red LED blinking 9 Multiple failures Alternation Red Blue 10 Perishable sensor reaching the end of life All LEDs blinking 11 No communication between front panel and probe after 30 seconds 10 NFC Used to recover and register LoRaWAN keys See commissioning manual and smartphone application 11 Removing the front panel of an installed probe There are 4 ...

Страница 8: ...which it has been subjected This device is guaranteed against any manufacturing or material defect within the limits of the following provisions The warranty is strictly limited to the exchange or repair in the factory of parts recognized as defective after examination and control to the exclusion of any other compensation The warranty period offered by the manufacturer is one year and begins to r...

Отзывы: