Page 10
17-110 -0143
7. System Layout
Only personnel trained, qualified and approved by the supplier should perform
installation, commissioning, service and repair procedures.
1
Compressor
(Not Supplied)
With External Desiccant Dryer
With Integrated Dryer
7
2
8
Buffer Vessel
3
Wet Air Receiver
(Not Supplied)
9
Pressure Relief Valve*
4
10
N2 Generator
5
Pre-filtration (
1 micron & 0.01 micron)
11
Dust Filter
(1 micron)
6
Desiccant Air Dryer
Nitrogen Outlet
Pre-filtration (
Water Seperator)
Dust Filter
(1 micron)
Ref
Description
Ref
Description
(1) It is the customers responsibility to ensure pressure relief valves are fitted to the compressed air system. All vessels supplied by nano
come with a pressure relief valves and pressure gauge as standard.
(2) Buffer vessel is used for mixing nitrogen gas, this is not to be used as downdtream storage.
(3) Reference ‘1’ & ‘2’ are supplied separately.
N2
Storage (Optional)
*Note: For service details please see page 20.
1
2
8
3
4
7
8
9
10
11
1
2
8
3
4
7
8
9
10
11
6
5
It is essential that the system into which the product is installed is fitted with a pressure
limiting/relief device. This device should be between the compressor and the generator.
The device must be set to prevent the maximum working pressure of 145psig (10 barg) or
232 psig (16 barg) from being exceeded.
Содержание GEN2-1110
Страница 1: ...GEN2 NITROGEN GENERATOR USER GUIDE...
Страница 23: ...Page 23 17 110 0143 14 Electrical Schematic 14 1 GEN2 1110 2110 3110 2130 3130 4130 6130 8130 10130 12130...
Страница 26: ...Page 26 17 110 0143 Notes...
Страница 27: ...Page 27 17 110 0143 Notes...