© by N&W GLOBAL VENDING S.p.A.
10
06 2007 294-00
charter 2
iNStallatioN
the machine installation and the following mainte-
nance operations should be carried out by qualified
personnel only, who are trained in the correct use
of the machine and are aware of the specific risks
of such operations.
the machine is not suitable for outdoor installation,
it must be installed in a dry room where the tem-
perature remains between 5° C and 32° C.
The relative humidity must not exceed 65%.
it cannot be positioned where water jets are used
for cleaning (e.g. in large kitchens, etc.).
the machine should be positioned with a maximum
inclination of 2°, if necessary provide proper level-
ling by way of the adjustable feet.
maiN SWitch
The power supply unit (see fig. 16) is fitted with a micro
-
switch that, when opening the payment system sliding
compartment, disconnects the power supply from the
machine electrical system.
Inside the machine, the only parts that stay energised
are those covered and carrying a plate with the warning
“disconnect the power before removing the protective
cover”.
before removing such covers disconnect the power
supply cable from the power outlet.
To energise the system with the sliding compartment
open, simply insert the key into the compartment switch.
uNpackiNg thE vENdiNg machiNE
After removing the packing, ensure that the machine is
intact.
If in doubt do not use the machine.
no packing elements (i.e. plastic bags, polystyrene
foam, nails, etc.) should be left within the reach of
children, as they are potentially dangerous.
Packing materials must be disposed of in authorised
containers and the recyclable ones must be recovered
by qualified companies.
if the vending machine had been laid down during
transport, allow at least one hour before connecting
it to the power supply.
iNStalliNg thE paymENt SyStEm
the machine is sold without payment system,
therefore the installer of such a system has sole
responsibility for any damage to the machine or to
things and persons caused by incorrect installation.
Install the coin mechanism paying attention, according to
the type used, to:
choose the most suitable securing holes;
-
loosen the fastening screw and adjust the coin slot
-
chute according to the coin mechanism opening;
loosen the fastening screws and adjust the selector
-
opening lever.
To aid installation the coin mechanism support plate
-
can be lifted and rotated.
Fig. 14
Coin chute fastening screw
1-
Coin chute
2-
Selector opening cam
3-
Selector lever fastening screw
4-
Coin mechanism securing holes
5-
Coin mechanism compartment door
6-
Coin mechanism
7-
Coin slot chute
8-
Coin return chute
9-
Содержание Snakky RY
Страница 1: ...Installation Use and maintenance EN English Doc No H 294U 00 Edition 1 06 2007 Snakky Ry...
Страница 2: ......
Страница 4: ......
Страница 48: ...sx436901 N W GLOBALVENDING S P A...
Страница 49: ...Snakky...
Страница 50: ...by N W GLOBAL VENDING SpA NOTE...
Страница 52: ......