Single-phase connection
Wiring
• Products should be installed only by authorized persons.
• Installation of the product should be specified in the project, installation to the wall or floor must be securely mounted.
If mounted on the wall, it should be mounted with bracket or with clamps.
• Fan blades must be installed at least 2.3 m above floor level, in case of wall installation.
• Fan can not be installed outside the window or wall.
• Necessary precautionary measures should be done to avoid back flow of gases into the chamber from outdoor gas pipe or
other fuels device. Wearing gloves is recommended during the assembly process.
• The product must be connected to the input and output ducts.
• Turn off the power before connecting electrical cords.
• When mounting brackets and mounts are installed correctly, make sure that they are solid enough to safely carry the weight
of product.
• Even if main power supply to the product is switched off, You should make sure of that while connecting facilities.
• Before installation please check whether the electrical connection information (voltage, power, frequency, etc..) which is
indicated on product label is matching with mounting area specification.
• There is no obstruction on the Air flow way.
• In terms of safety, ground terminal which is located in connection box should be connected to the building ground.
• Make sure that motor thermal and overload relay are connected properly.
• Product wiring, electrical connections must be as in the diagram.
• Contact separation in all poles along with a switch that must be connected to fixed wiring installations in accordance with
the rules.
13
ALNOR
®
ventilation systems
is a legally protected trademark and technical patent. All rights reserved.
w
w
w
.ve
nt
ila
tio
n-a
ln
or.
co
.u
k
User manual
DV-ROF-R