background image

19 

WWW

.N

AKAYAMA

T

OOLS

.

COM

 

 

 Attentions 

A. Pay attention to the power tiller working situation, make sure all the parts are well connected.  

B. A cold machine is forbidden to do heavy load work immediately after it is started, especially 

for new machines or overhauled machines. 

C. Pay attention to the oil levels of engine and gear box. Refill the engine oil when it is not 

enough 

D. It is not allowed to cool the engine by watering 

E. Be cautious about the machine’s tilting when farming. 

F. The machine mounted with revolving farming blades is forbidden to run on beach or pebbles. 

G. After using the power tiller for farming, please clean dirt, weeds and smear on the machine 

to keep it clean. 

H. Clean the sponge or the wire mesh in the air cleaner and change the engine oil frequently 

Chapter Five Maintenance 

When the power tiller is under operating, due to the changes of running, abrasion and loading, 

bolts loosening and parts wearing are inevitable, which will lead to the system malfunction, high 

oil consumption and other failures of the machine. To reduce the trouble possibility, it is better to 

maintain the power tiller regularly and strictly to keep the machine in a good condition and to 

extend its working life.  

 

 

Running

-in 

A. For engine running-in, please refer to the engine instruction manual 

 

B. For a new or overhauled power tiller, please drain all the lubricant from the gear box and 

engine crankcase immediately after working for 1 hour under no load or 5 hours under light load. 

Then refill in engine oil according to 4 clause chapter 3 for a four- hour running- in before the 

machine can be operated.  

 

Ⅱ Maintenance

 

A. Normal maintenance (before and after every operation) 

a) Listen and observe if there are any abnormalities (such as abnormal sound, overheating and 

bolt loosening, etc) 

b) Check if there is oil leakage in engine, gear box and stepping box 

c) Check if the oil level in engine and gear box is between the dipsticker limitations. 

d) Clean the mud, weeds and smear on the machine in time after operating. 

e) Keep a good farming record 

B. The first rate maintenance (every 150 working hours) 

a) Do all the things listed for normal maintenance. 

b) Clean the gear box and step box, and change the engine oil 

c) Check and adjust the clutch, shift system and reversing system. 

C. Second rate maintenance (every 800 working hours) 

a) Do all the things listed in first rate maintenance. 

b) Check all the gears and bearing, replace with new ones if serious abrasion is found. 

 c) Replace with new ones if damages are found with revolving farming blades, connection bolts or 

other parts.,. 

D. Technical overhaul (every 1500-2000 working hours) 

a) Take the power tiller to your local special service center for overhaul. 

b) Please ask professional serviceman to check the friction piece and clutch. 

E. Refer to the engine instruction manual for engine maintenance 

 

Technical maintenance reference sheet (items with “●” is required)

 

  

  

Items  

Every 

time 

After 

using 

8 hours 

under half 

load 

The 1

st

 

month or 

after 20 

working 

hours 

The 3

rd

 

month or 

after 150 

working 

hours 

Every year 

or after 

1000 

working 

hours 

Every two 

years or 

after 2000 

working 

hours 

Bolts checking 

 

 

 

 

 

 

Engine oil checking 

 

 

 

 

 

 

Fuel checking and filling 

 

● 

 

● 

 

● 

 

 

 

Oil leakage checking 

 

 

 

 

 

 

Machine cleaning 

 

 

 

 

 

 

Trouble eliminating 

 

 

 

 

 

 

Control parts checking 

 

 

 

 

 

 

Clutch friction checking 

 

 

 

 

 

 

gears and bearing checking 

 

 

 

 

 

 

Содержание MB7000

Страница 1: ...MB7000 Owner s manual WWW NAKAYAMATOOLS COM...

Страница 2: ...2 WWW NAKAYAMATOOLS COM MB7000 Classic 198cc HP 6 5 SAE 20w50 Sae 30 700ml X X mm 1400 X1000 X980 kg 100 cm 90 110 12 12 2 sae 20w50 Sae 80...

Страница 3: ...3 WWW NAKAYAMATOOLS COM 1 2 3 4 5 6 7 8 1 2 3...

Страница 4: ...4 WWW NAKAYAMATOOLS COM 1 8 55 8 2 16 140 1 7 1...

Страница 5: ...5 WWW NAKAYAMATOOLS COM 1 2 2 1 2 3 80 90...

Страница 6: ...6 WWW NAKAYAMATOOLS COM 4 SAE20 50 SAE 30 1 1750ml 20 50 1...

Страница 7: ...7 WWW NAKAYAMATOOLS COM 2 2 3 3 1 1 2 2 3 4 5 6 1 2 25cm 25 40cm...

Страница 8: ...8 WWW NAKAYAMATOOLS COM 3 4 10km h 5km h 1 2 3 4 5 6 7 8 1 5 3 5 4...

Страница 9: ...9 WWW NAKAYAMATOOLS COM 1 2 150 3 800 4 1500 2000 8 20 3 150 1000 2 2000 0 0 0 0 0 0 0 0 0 0 0...

Страница 10: ...10 WWW NAKAYAMATOOLS COM 1 2 3 4 5...

Страница 11: ...11 WWW NAKAYAMATOOLS COM ring o ring...

Страница 12: ...If there is abnormal shaking for the machine please turn off the engine Abnormal shaking can be a forewarning of machine failure F Turn off the engine when repairing adjusting or checking the machine...

Страница 13: ...er 11 Engine 12 Gear box 13 Armrest fix handle14 Armrest adjusting bar 15 Shift bar Chapter Three Main Application of Power Tiller Revolving Farming Install the revolving farming device onto the outpu...

Страница 14: ...c Chapter Four Operation Use Method of Power Tiller Assembly after unpacking refer to picture 4 A Wheels mounting Mount the wheels at the two ends of the hexagonal output shaft with two M8 55 bolts an...

Страница 15: ...the big hole on the fork shaft j Properly pull the reversing fork shaft counterclockwise get the cable into the gap the reversing cable seat at the side of the gear box and ensure the cable head goes...

Страница 16: ...bar of the gear box to the neutral position D Fill in engine oil a Fill in SAE15W 40 lubricant oil into the engine crankcase Refer to picture 9 for details b Put the machine stably and horizontally a...

Страница 17: ...throttle left 4 Pull the engine switch to ON Pull the starting rope slightly and then pull with power after there is resistence Warning do not let the starting rope go suddenly or it will destroy the...

Страница 18: ...handle and turn off the accelerator switch Use of shifts Four shifts are available Changing shift 1 Turn off the accelerator switch 2 Grasp the clutch handle tightly to separate the clutch 3 Pull the...

Страница 19: ...hour running in before the machine can be operated Maintenance A Normal maintenance before and after every operation a Listen and observe if there are any abnormalities such as abnormal sound overheat...

Страница 20: ...ance of the gear 0 05mm please put some vulcanized gasket between the gear box and the step box to enlarge the lateral clearance b When lateral clearance of the gear 0 30mm please put some vulcanized...

Страница 21: ...can be adjusted up and down left and right appropriately according to the user s personal condition and the farming condition Do as following A Up and down adjustment a Loosen the armrest handle assem...

Страница 22: ...versing shaft back bolts Reversing shaft spring failure Replace the spring Reversing shaft is bent and deformed Replace the reversing shaft The reversing shaft is loosen Reversing shaft back bolts of...

Страница 23: ...Seal gasket is damaged Replace Oil leakage of the output shaft casing Oil seal damage Replace oil seal B45 62 8 Serious oil leakage of the hexagonal hole in the output shaft casing Shaft casing breaki...

Страница 24: ...26 WWW NAKAYAMATOOLS COM...

Отзывы: