background image

 

文件编号:

NDT2920016 

文件版本:

 

地址:上海市浦东新区申江南路

2000

           

邮编:

201315         

电话:

(021)68586699         

传真:

(021)23025796

                                 

  20 

 

  24 

 

8.5 Manual operating mechanism 
8.5.1    Before installation, a switch cabinet door for installing 
    operating handle is holed in accordance with the diagram. 

Distance between the holed part and the hinge is greater than 200 mm. 

8.5.2 The breaker with an operating mechanism fixed on cover is installed on the installation panel and 
slightly fixed then. 
8.5.3 The square shaft of an operating rod is fixed in a square hole on the operating mechanism. 
8.5.4 he holed door plank is closed and position of the breaker is adjusted so that centers of the square 
shaft and the handle hole are aligned. 
8.5.5  The  switch  cabinet  door  is  opened.  The  rotary  handle  is  fixed  until  “OFF”  is  at  the  horizontal 
position. 
8.5.6 The switch cabinet door equipped with rotary handle is closed. The handle should be operated 
freely. The breaker should be opened when the handle is at the horizontal position, and it should be 
closed when the handle is at the vertical position. 

     

     

       

 

CS1-A 型手柄开孔图

       

CS1-F 型手柄开孔图        CS2-A 型手柄开孔图

         

CS2-F 型手柄开孔图

 

CS1-A type holing diagram of handle

   

CS1-F type holing diagram of handle      CS2-A type holing diagram of handle

       

CS2-F type holing diagram of handle 

9.

 

使用和维护/ Application & Maintenance 

9.1 运行前检查和准备 
运行前应检查以下各项 

(1)核对接线是否正确,见第 7 点接线方式图。 
(2)确认端子间或暴露的带电部分没有短路或对地短路情况。 

(3)确认端子连接和固定螺钉均应紧固无松动 
(4)断路器带有欠电压脱扣器,应使脱扣器先通电,断路器才允许合闸。 

9.1 Examination and preparation before working 

The following items should be examined before working 

  (1)Check whether wiring is right; see the seventh wiring diagram. 

(2)Make sure that there is no short circuit on the part between every two terminals or on exposed 

electrified parts or no short circuit. to earth.。 

(3)Make sure terminal connection and fixing screw are fastened. 

(4)If  the  breaker  has  an  undervoltage  tripper,  the  breaker  is  allowed  to  close  only  when  the 

undervoltage tripper is electrified. 
 

Содержание NDM2 Series

Страница 1: ...DT2920016 4 2000 201315 021 68586699 021 23025796 1 24 Shanghai Liangxin Electrical Co Ltd NDM2 NDM2 Series MCCB Product Manual IPD ENG DEV T32 A0 2019 11 05 2020 10 20 2020 10 20 2020 10 20 2020 10 2...

Страница 2: ...01315 021 68586699 021 23025796 2 24 3 3 1 Update the technical patameters of project 3 see table 1 for details 20200725 Wang Hu Peng Haoran Hu Qi 4 Change the altitude derating factor 20201020 Wang H...

Страница 3: ...ation scope 4 2 Model and implication 4 3 Main technical parameters 7 4 Stand working conditions 9 5 Wiring Method 11 6 Shape dimension Dimension 12 7 Mounting Method 17 8 Accessory 18 9 Application M...

Страница 4: ...d and marine use The rated working voltage i s AC 690V with the insulation voltage of 1000V will be suitable for in frequency switching of circuits and starting of motors in 50 60Hz circuit The breake...

Страница 5: ...ents motor protection 12 4 N N pole type of four pole product below A N N A N pole is always close without overload release B N N B N pole is open or close together with other three poles and without...

Страница 6: ...ps of double auxiliary contact 60 Two groups of single auxiliary contact 61 Double auxiliary contact single auxiliary contact 62 Undervoltage release double auxiliary contact 70 Undervoltage release s...

Страница 7: ...echanical life 20000 NDM2 63M 52 5 38 NDM2 63 4P 52 5 38 NDM2X 125 125 35 26 25 380 400 415 16 20 25 32 40 50 63 80 100 125 Electrical life 8000 Mechanical life 20000 NDM2 125C 25 18 75 NDM2 125L 36 2...

Страница 8: ...s NDM2 400C 400 35 26 25 100 400 415 50 60 225 250 315 350 400 Electrical life 7500 Mechanical life 10000 NDM2 400L 50 37 5 NDM2 400M 65 48 75 50 50 500 20 15 690 NDM2 400H 100 75 400 415 NDM2 400 4P...

Страница 9: ...r 6 Resisting effects by salt mist and oil mist 7 Resisting the effects by mould 8 Installation category for the breaker which is connected to main circuit Installation category for the breaker which...

Страница 10: ...2 0 901 0 879 5 630 1 0 979 0 958 0 937 0 915 0 893 0 871 6 800 1 0 980 0 960 0 939 0 918 0 897 0 877 5 table5 Molded Case Circuit Breaker Derating Coefficient Table in High altitude Place m Altitude...

Страница 11: ...0 M12 28 M6 6 5 Wiring Method 7 Table 7 of sectional area and applicable rated current adopted in wiring A Rated current A 10 12 5 16 20 25 32 40 50 63 80 100 125 140 160 180 200 225 250 315 350 400 W...

Страница 12: ...25796 12 24 6 Shape dimension Dimension 1 2 This product can also be front plate connector wiring on back of the board specific see Figure 1 figure 2 1 Fig 1 Front connection NDM2 63 800 NDM2X 125 2 F...

Страница 13: ...H5 79 73 78 H4 54 53 58 Front connection L2 117 132 144 H3 7 7 5 H2 20 5 27 5 24 24 H1 90 5 98 5 86 104 110 127 L1 172 250 291 W2 103 122 142 H 74 81 5 69 87 5 86 103 L 135 150 165 W1 50 60 30 60 70 W...

Страница 14: ...ons d 7 7 7 B 194 200 243 A 44 58 70 Dimentions Rear connection H5 82 88 98 H4 42 44 33 Front connection L2 223 6 234 243 H3 9 8 11 5 H2 38 43 40 43 H1 157 159 159 L1 475 488 498 W2 198 240 280 H 106...

Страница 15: ...terminal cover Without a terminal cover NDM2 63 25 65 30 30 NDM2 X 125 25 65 30 30 NDM2 250 25 65 30 30 NDM2 400 25 120 35 35 NDM2 630 25 120 35 35 NDM2 800 25 120 35 35 6 2 6 2Minimum center distance...

Страница 16: ...t breaker from bottom With a terminal cover Without a terminal cover NDM2 63 90 90 NDM2 X 125 90 91 NDM2 250 90 93 NDM2 400 155 155 NDM2 630 155 155 NDM2 800 155 155 1 2 3 Note 1 Cable insulating conn...

Страница 17: ...s carried out on the breaker again 500VDC tramegger When breaker is broken up insulation test is conducted separately between connecting panels 1 2 3 4 5 6 connecting panels 1 3 5 and shell Undervolta...

Страница 18: ...ly break the breaker up when power voltage is lower than the rated working voltage of undervoltage tripper by 35 the undervoltage tripper can prevent the breaker from closing when power voltage is hig...

Страница 19: ...C400V 0 15 DC220V 8 3 2 8 3 2 Status indicator diagrams of auxiliary and alarm contacts Accessary Name Status of breaker Connection status of circuits Auxiliary contact Breaking or free tripping Closi...

Страница 20: ...5 6 The switch cabinet door equipped with rotary handle is closed The handle should be operated freely The breaker should be opened when the handle is at the horizontal position and it should be close...

Страница 21: ...onal technicians To guarantee quality the company provide internal and external accessories to customer according to the subscribed type The company is free from responsibility if the customer purchas...

Страница 22: ...wire connection base for insertion wire connection of the breaker are fixed on an installation panel 2 Connected to main circuit 2 1 Wiring operation should be carried out by professional technicians...

Страница 23: ...r maintenance or exchange should be paid in warranty period if the error is caused by any one of the following reasons 1 Improper use self refit improper maintenance and so on 2 Use out of the standar...

Страница 24: ...e a knowledge of technical documents of this product and maker order by an Ordering rule table in accordance with the future practical use of breaker Shanghai Liangxin Electrical CO LTD 2000 No 2000 S...

Отзывы: