Configuration/settings
User manual 55530_hdb_en_16
110 / 156
8.6
Project planning of the Fast Start Up
Topology
To configure the module for the Fast Start-Up (FSU) and to achieve the de-
sired run-time characteristics, several steps are needed. The corresponding
parameters are set directly in the module.
Select the module in the
Topology view
.
Fig. 8-37: Topology
Activation of the priori-
tized startup
Fig. 8-38: Enabling prioritized startup
Activate the menu option
Prioritized startup
.
This activates the fundamental FSU functionality for the module.