8. After thoroughly flushing the 3/8” outer diameter supply line, connect water supply to the multi-line “Y” strainer
assembly. From multi-line “Y” strainer assembly, connect to drinking fountain bubbler.
8. Fixture operates within water pressure range of 174 kPa (25 psig) to 724 kPa (105 psig). Acorn Engineering
will not warranty chiller damaged when connected to supply lines with flow pressure lower that 174 kPa (25
psig) or higher than 724 kPa (105 psig). A pressure regulator must be furnished by others on supply line if
inlet pressure is greater than 724 kPa (105 psig).
4. Remove the drinking fountain top by taking out the drain screw and lifting at the front while pulling forward.
Disconnect bubbler tube. Set top aside in a safe place where it will not be damaged. Place the screw in a
secure location where it will not be lost.
5. Receptacle(s) must be wired to a GFCI protected circuit. Fixture must be earth grounded per NEC (National
Electrical Code).
2. Waste is 1-1/4” Outer Diameter. Drinking Fountain water inlet is 3/8” Outer Diameter copper tube. Bottle
Filler water inlet is 3/8” Outer Diameter copper tube. Water line by others.
5. Slide Fixture over studs and secure with nuts and washers.
3. Completely flush supply lines of all foreign debris before connecting to fixture. Optional water filter (WF1), is
available should any problems with taste, odor, color, or sediment arise from the water supply.
IMPORTANT:
1. Water Supply Service Stop Valve, Water Connections and Electrical Connections to be supplied by others in
accordance with local codes.
4. Do NOT solder tubes inserted into the bottle filler or the fountain strainer as damage to the o-rings on the
push-in fittings may result.
PRIOR TO INSTALLATION:
3. Provide mounting surface, sufficient to support the fixture and loads on the fixture.
6. Completely flush water supply lines of all foreign debris, before connecting to the fixture.
DRINKING FOUNTAIN INSTALLATION:
9.
Per UPC 609.10-All building water supply systems in which quick acting valves are installed shall be
provided with devices to absorb the hammer caused by high pressure resulting from the quick closing of the
valve. These pressure-absorbing devices shall be approved mechanical devices. Water pressure-absorbing
devices shall be installed as close as possible to the quick closing valve.
5. All burrs must be removed from outside of cut tubes before inserting into strainer or other components.
1. Read all installation instructions carefully, before proceeding.
2. Carefully remove all fixture components from packaging, preventing scratching or damage. Inspect fixture and
all parts from damages and all parts are bolted on.
7. This unit must be grounded per the requirements of applicable electrical codes.
1. Insert mounting frame into the rough-in block out and secure using 1/4”-20 UNC mounting hardware (Provided
by Others).
2. Hang trim panel on mounting frame. Note: The included 1” brackets do not get used with this installation and
the plastic spacers are typically not required and can be discarded.
6. Assemble P-trap to drain adapter and then assemble to unit with Phillips screws.
7. Make-up 1-1/4” outer diameter waste connection.
6. Provide electrical service to J-Box to power sensor and solenoid valve.
4. Provide rough-ins as shown on the roughing-in and dimensional drawing, including water supply, drain pipe
and gravel drain well. (See rough-in details)
3. Install the four threaded studs into the Wall Mounting Frame
9. Place drain gasket on drain adapter. Reconnect bubbler tube. Reassemble top to unit by engaging back clip
and securing with screw.
A131-VR-BF4
Page 5 of 19
New: 10/29/2020
7021-013-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
DRINKING FOUNTAINS