![Munters TRIO Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/munters/trio/trio_user-and-installation-manual_1856900026.webp)
© Munters AB, 2020
26
3.4.6.3
Humidity Sensor Wiring
Figure 18: RHS+ Wiring
Number
Function
1
COM port (black wire)
2
12V (red wire)
3
S port (white wire)
4
Shield wire
Figure 19: RHS+ Sensor Wiring Schematic
•
Connect each RHS+ sensor to a:
o
S port. In the corresponding dipswitch, raise dipswitch 3 (analog input).
o
COM port.
o
12VDC port.
o
Grounding strip!
Содержание TRIO
Страница 18: ... Munters AB 2020 18 Figure 5 Relay wiring detailed view Figure 6 Relay and port numbering ...
Страница 31: ... Munters AB 2020 31 Figure 27 Static pressure tubes NOTE After installing the RPS no Cold Start is required ...
Страница 86: ... Munters AB 2020 86 ...
Страница 88: ... Munters AB 2020 88 4 Verify that each channel is enabled ...
Страница 90: ... Munters AB 2020 90 The following screen should appear 7 15 3TESTING THE BIRD SCALE 1 Click Test ...
Страница 117: ... Munters AB 2020 117 4 Click the fan in the upper right Both fans turn blue 5 Define fans as required ...
Страница 170: ... Munters AB 2020 170 Click to view the bird scale data ...
Страница 180: ... Munters AB 2020 180 25 3 2TRIO 20 CONTAINER SPARE PARTS ...
Страница 182: ... Munters AB 2020 182 25 3 3TRIO 20 DOOR CARD SPARE PARTS ...
Страница 184: ... Munters AB 2020 184 25 3 4TRIO 20 MAIN CONTAINER SPARE PARTS ...
Страница 196: ... Munters AB 2020 196 Figure 36 Relay and port numbering 26 2 3POWER Figure 37 Power ports ...