Figure. 7.9.3.1. - 255. Removing the bearing and O-ring
2. Detach the O-ring (3) from the front of the bearing.
3. Remove the bearing (2) from the bearing housing (1).
Pull the bearing using a clamp.
7.9.3.2. Installing the bearing
Figure. 7.9.3.2. - 256. Installing the bearing
1. Clean the bearing housing (1).
2. Install a new bearing (2).
Install the bearing using a clamp.
3. Replace the O-ring (3).
Operation and maintenance manual
FX300 and FX400 SeedPilot
1.00
186 (208)
Содержание FX300 SeedPilot
Страница 200: ...Hydraulic schematics FX300 and FX400 1 Hydraulic schematics FX300...
Страница 201: ...Hydraulic schematics FX300 and FX400 2...
Страница 202: ...Hydraulic schematics FX300 and FX400 3 Hydraulic schematics FX400...
Страница 203: ...Hydraulic schematics FX300 and FX400 4...
Страница 204: ...Electrical schematics FX300 and FX400 1 Electrical schematics...
Страница 205: ...Electrical schematics FX300 and FX400 2...