2998
Figure. 7.2.10. - 142. Detaching the wheel packer bar
4. Detach the two cotters (2) of the wheel packer bar (1).
5. Detach the wheel packer bar by lifting it.
Figure. 7.2.10. - 143. Wheel hubs of the wheel packer
6. Lubricate the four wheel hubs (1).
There is one lubricating nipple in the wheel hubs.
7. Replace the wheel packer bar and lock the bar with cotters.
8. Lift the ground support.
7.2.11. Lubricating the front levelling board cylinders
Figure. 7.2.11. - 144. Front levelling board cylinders
1. Lubricate the two front levelling board cylinders (1).
There is one lubricating nipple at the top of the cylinder.
Operation and maintenance
manual
1.00
Cerex 300
120 (156)
Содержание Cerex 300 SeedPilot
Страница 159: ...Hydraulic schematic Appen dix 2 Cerex 300 1 Appendix 2 Hydraulic schematic...
Страница 160: ...Hydraulic schematic Appen dix 2 Cerex 300 2...
Страница 161: ...Electrical Diagram Annex 3 Cerex 300 1 Annex 3 Electrical Diagram...
Страница 162: ...Electrical Diagram Annex 3 Cerex 300 2...
Страница 163: ...Electrical Diagram Annex 3 Cerex 300 3...