![MULTIQUIP MAYCO LS300G Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/multiquip/mayco-ls300g/mayco-ls300g_operation-manual_1855385069.webp)
MAYCO LS300G CONCRETE PUMP • OPERATION MANUAL — REV. #2 (09/09/19) — PAGE 69
Lights and Signals
Before each tow, check the trailer taillights, stoplights, turn
signals and any clearance lights for proper operation.
Table C. Tire Torque Requirements
Wheel Size
First Pass
FT-LBS
Second Pass
FT-LBS
Third Pass
FT-LBS
12"
20-25
35-40
50-65
13"
20-25
35-40
50-65
14"
20-25
50-60
90-120
15"
20-25
50-60
90-120
16"
20-25
50-60
90-120
Replace any broken or burned-out lamps as necessary.
Check the wire harness for cuts, fraying or other damage.
If it needs replacing, contact your dealer.
WARNING
Improper operating taillights, stoplights and turn signals
can cause collisions.
Check all lights before each tow.
Figure M. Trailer to Tow Vehicle Wiring Diagram
TRAILER GUIDELINES
Содержание MAYCO LS300G
Страница 2: ...PAGE 2 MAYCO LS300G CONCRETE PUMP OPERATION MANUAL REV 2 09 09 19 PROPOSITION 65 WARNING...
Страница 5: ...MAYCO LS300G CONCRETE PUMP OPERATION MANUAL REV 2 09 09 19 PAGE 5 NOTES...
Страница 73: ...MAYCO LS300G CONCRETE PUMP OPERATION MANUAL REV 2 09 09 19 PAGE 73 NOTES...
Страница 85: ...MAYCO LS300G CONCRETE PUMP OPERATION MANUAL REV 2 09 09 19 PAGE 85 HYDRAULIC SYSTEM DIAGRAM...