MULTIFIT 720589801 Скачать руководство пользователя страница 1

© Baxi Heating UK Ltd 2010

I N S TA L L AT I O N   I N S T R U C T I O N S

Advance & HeatSaver Systems

Hot Water System incorporating:-
Passive Flue Gas Heat Recovery Device

50 Litre Temporal Store

Condensing Combination Boiler (Advance System only)
‘Low Profile’ Flue Elbow  (Advance System only)

Part No. 720589801 - Advance System
Part No. 720721001 - HeatSaver System

Please leave these instructions with the
user for safe keeping, along with the boiler 
Installation & Servicing Instructions. 

Содержание 720589801

Страница 1: ...Flue Gas Heat Recovery Device 50 Litre Temporal Store Condensing Combination Boiler Advance System only Low Profile Flue Elbow Advance System only Part No 720589801 Advance System Part No 720721001 H...

Страница 2: ...ng British Standard Codes of Practice BS 5440 1 2000 Flues BS 5449 1990 Forced circulation hot water systems BS 5546 2000 Installation of hot water supplies for domestic purposes BS 6700 1997 Design i...

Страница 3: ...sure is above 500 KPa 5 bar a pressure reducing valve must be fitted 250 kPa 2 5 bar 50 kPa 0 5 bar 82 C 300 kPa 3 bar 8 l at 80 kPa 0 8 bar 100 kPa 1 0 bar 15mm Copper 50 l Maximum Working Pressure M...

Страница 4: ...ket drill and plug the wall Secure the bracket Manouvre the store into position and engage the locating bolt at the rear in the wall bracket 370 mm 150 mm 100 mm Minimum clearance 910 mm D E C B A s n...

Страница 5: ...ng slots in the wall mounting frame is 1780mm from the floor Fig 3 Also note the 800mm minimum width required if the 2 port valves and expansion vessel are to be installed in the immediate vicinity of...

Страница 6: ...ive L N E Room Stat S Plan Valve Motor Valve 1 DHW safety Valve 3 Heating Valve 2 DHW Store Wiring internal wiring shown as dotted lines gr br b br b br br gr gr b br br b b br b or br gr or 1 2 or or...

Страница 7: ...in length This pipework must be insulated All pipework carrying potable water i e DHW must be 22mm diameter to ensure 18l min flow is achieved Advance System only NOTE This diagram is a SYMBOLIC REPR...

Страница 8: ...re to do so will invalidate the warranty The system should be flushed in accordance with BS 7593 and BS 5449 The following procedures are recommended 1 Installing onto a new system a Fill the system v...

Страница 9: ...l cold mains and hot water pipework as shown in Fig 5 Ensure that the blending valve is connected to the hot water outlet pipework from the store also shown in Fig 5 Note WARNING ISOLATE ELECTRICAL SU...

Страница 10: ...as well as the boiler expansion vessel should be checked and re pressurised if necessary Notes 1 Check the expansion vessel charge only when the system pressure is zero 2 The expansion vessel pressure...

Страница 11: ...gister No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature D...

Страница 12: ...d improvements in our products which may affect the accuracy of the information contained in this leaflet All goods are sold subject to our standard Conditions of Sale which are available on request M...

Отзывы: