
DF-8500 Gas Detector
3 Installation
The device should be installed where gas leaks are expected. The installation
position depends on the gas density, either in the upper area of the room under the
ceiling for gases lighter than air or closer to the ground for gases heavier than air.
Also consider how air movement may affect the ability of the device to detect as. The
display on the front of the instrument must always be clearly visible, and he view
must not be obstructed.
When preparing the assembly, make sure that the mounting arrangemen
t
is correct for the particular device.
3.1 Mechanical Installation
3.1.1 Dimensions Diagram(Unit: mm)
Figure.3 DF-8500 Dimension Diagram
40
Содержание DF-8500
Страница 3: ...DF 8500 1 1 1 DF 8500 SUPREMA Gasgard XL 9010 9020 8020 1 2 4...
Страница 4: ...DF 8500 1 3 5...
Страница 5: ...DF 8500 1 4 1 2 12 2 2 1 1 DF 8500 6...
Страница 7: ...DF 8500 3 3 1 3 1 1 mm 3 DF 8500 8...
Страница 12: ...DF 8500 4 4 1 4 0mA LED LED CO H2S 1000 1000 mol mol 100 300 100 mol mol 300 mol mol 1 mol mol 1ppm 13...
Страница 20: ...DF 8500 M 14 M 02 M 02 M 14 1 M 03 2 M 14 3 ON 4 4 4 5 M 14 M 03 OFF M 14 ON M 03 6 4 3 0 25 21...
Страница 21: ...DF 8500 4 2 2 M 01 4 2 2 M 02 OFF 4 4 4 0000 1 2 ON 3 4 5 5 1 M 05 22...
Страница 25: ...DF 8500 6 5 DF 8500 1 0 3 DF 8500 25 DF 8500 TLV 1 DF 8500 26 100 2 2 0 3 0 25 0 0 5 0 100 0 5000 0 50 0...
Страница 28: ...DF 8500 9 9 1 29 LED 4 20 mA 4mA 4mA E XX 2mA HI 20 5mA BOOT 0mA 0 3 2mA...
Страница 33: ...DF 8500 SJ T 11364 GB T 26572 GB T 26572 34 Pb Hg Cd Cr VI PBB PBDE DF 8500...