MRU GmbH
SWG 100 User Manual
Page
20
of
141
5.2.
Installation of the analyzer
The analyzer is equipped with adapters for the wall mounting. The dimensions for the wall
mounting are shown in picture below.
ATTENTION
Operation of the analyzer
Only operate the analyzer in an upright position.
Only power the device up after it is correctly mounted.
General installation rules
•
Mount the device on a solid wall or steel rack.
•
Be sure, that the air circulation is not obstructed.
•
Let enough room for the tubing or piping.
For outdoor installation
Ensure that the analyzer is mounted on a rain and sun protected place (weather shade).
For indoor installation:
Ensure that the analyzer is installed on a dry and clean place. Be sure that the room is permanently
vented with fresh air.
Содержание SWG 100 biogas
Страница 1: ...MRU GmbH SWG 100 User Manual Page 1 of 141...
Страница 2: ...MRU GmbH SWG 100 User Manual Page 2 of 141...
Страница 13: ...MRU GmbH SWG 100 User Manual Page 13 of 141 Picture above Sample gas flow diagram...
Страница 81: ...MRU GmbH SWG 100 User Manual Page 81 of 141 Device info Path EXTRAS DEVICE INFO Structure...
Страница 86: ......
Страница 92: ......
Страница 133: ...MRU GmbH SWG 100 User Manual Page 133 of 141 13 15 Option NDIR bench for 0 3 000ppm CO2 0 CH4...
Страница 134: ...MRU GmbH SWG 100 User Manual Page 134 of 141 13 16 Option Dilution unit for H2S and CO electrochemical sensors...
Страница 140: ...MRU GmbH SWG 100 User Manual Page 140 of 141 14 Declaration of conformity...
Страница 141: ...MRU GmbH SWG 100 User Manual Page 141 of 141 V01 02 EN...