background image

MGA

prime

  

QUICK START GUIDE 

9454EN-PRQ 

Содержание Air Fair MGAprime

Страница 1: ...MGAprime QUICK START GUIDE 9454EN PRQ...

Страница 2: ...on the supplied USB stick Remove the cap of the USB stick Insert the USB stick into your computer NOTE You can download the complete User manual directly using the following QR code Scan the QR Code...

Страница 3: ...tal housing with shock absorbing rubber corners All electrical and pneumatic connections are located on the both front sides of the instrument It is operated exclusively via the touch sensitive touch...

Страница 4: ...ated Gas sampling probe Check the probe filter before and after each measurement 1 Probe handle 2 Probe tube 3 Fast locking coupling 4 Probe cone 5 Cable plug 14 pin 6 Heated hose line 7 Cable coupler...

Страница 5: ...into contact with acid wash the area immediately using a lot of water Note the safety data sheet for phosphoric acid 10 Consider to connect a container to the condensate out port Phosphoric acid 10 i...

Страница 6: ...upply Front side left 8 Sample gas filter 9 Condensate outlet port Hose connection DN 4 6 10 Sample gas outlet port VENT Hose connection DN 4 6 11 Fresh air inlet port 12 Sample gas inlet port 13 Outl...

Страница 7: ...y are switched on In the event of an error the Power LED lights red The device runs through a start routine of 30 minutes The start routine includes self test warm up of the NDIR bench cool down of th...

Страница 8: ...ndow dependent additional functions 6 Measurement 6 1 Prepare measurement Operating temperature The internal gas cooler operates at 4 C which is the dew point of the sample gas to the sensors Componen...

Страница 9: ...t port 12 gas coupling and round plug Note that acidic condensate as well as phosphoric acid is discharged from the condensate out port 9 Consider to connect a hose or collecting container to the cond...

Страница 10: ...o the analyser The AUX connection cable ensures that no phosphoric acid 10 is injected into the analyser when the pumps are switched off Plug the couplings of the connecting hose into the connection n...

Страница 11: ...lights up green as soon as phosphoric acid 10 will be injected The control of the acid dosing unit APE begins 40 minutes after the analyser is started 6 2 Take a measurement Touch the menu Measure The...

Страница 12: ......

Отзывы: