6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
217
7545652/00 EN
VACUTAP
®
VR-Ex
6.3 Commissioning transformer at operating site
Before energizing the transformer, check that the motor-drive unit and pro-
tective devices are functioning correctly and fill the on-load tap-changer oil
compartment with fresh insulating fluid.
6.3.1 Filling the oil compartment of the on-load tap-changer with
insulating fluid
NOTICE
Damage to the on-load tap-changer!
Unsuitable insulating fluids cause damage to the on-load tap-changer.
► Use insulating fluids that meet the requirements in accordance with IEC
60296.
► If approved by the transformer manufacturer, you can use synthetic es-
ters in accordance with IEC 61099 or natural esters in accordance with
IEC 62770 approved by Maschinenfabrik Reinhausen GmbH.
1. Establish a connecting lead between pipe connection E2 and one of the
pipe connections R, S or Q to ensure equal pressure in the oil compart-
ment and transformer during evacuation.
Figure 250: Connecting lead between E2 and Q
Содержание VACUTAP VR-Ex
Страница 73: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 73 7545652 00 EN VACUTAP VR Ex Figure 70 VACUTAP VRS ...
Страница 74: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 74 7545652 00 EN VACUTAP VR Ex Figure 71 VACUTAP VRM VRH VRX ...
Страница 75: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 75 7545652 00 EN VACUTAP VR Ex Figure 72 VACUTAP VRM VRH VRX ...
Страница 76: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 76 7545652 00 EN VACUTAP VR Ex Figure 73 VACUTAP VRL VRH ...
Страница 77: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 77 7545652 00 EN VACUTAP VR Ex Figure 74 VACUTAP VRL VRH ...
Страница 234: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 234 7545652 00 EN VACUTAP VR Ex 9 Drawings 9 1 Dimensional drawings ...
Страница 237: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 237 7545652 00 EN VACUTAP VR Ex 9 2 On load tap changer head ...
Страница 238: ......
Страница 241: ......
Страница 242: ......
Страница 243: ......
Страница 244: ......
Страница 245: ......
Страница 246: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 246 7545652 00 EN VACUTAP VR Ex 9 3 Adjustment plans ...
Страница 254: ......
Страница 255: ......