7 Initial steps
Maschinenfabrik Reinhausen GmbH 2022
71
8595028/00 EN
TAPCON
®
250
7 Initial steps
NOTICE
Damage to device and system periphery
An incorrectly connected device can cause damage to the device and sys-
tem periphery.
► Check the entire configuration before commissioning.
As soon as the device has powered up and the start screen is displayed, you
will be asked to make the following settings:
7.1 Establishing connection to visualization
A connection to the visualization can be established using two interfaces:
▪ Front interface (for local access)
▪ Optional: Interface X2 of COM-ETH on the rear of the device (for access
via remote display, control center etc.)
The interfaces do not use a DHCP server. Therefore, you must assign a
static IP address to your PC. To do this, observe the following configuration
example:
▪ Interface configuration example
Interface
Configuration
Basic
CPU X2
IP address: 192.168.165.1
PC
IP address: 192.168.165.200
Subnet mask: 255.255.255.0
System requirements
To access the web-based visualization, you need a PC with an HTML5-ca-
pable browser. The display is optimized for the following browsers:
▪ Microsoft Edge
▪ Google Chrome™
Содержание TAPCON 250
Страница 1: ...Voltage regulator TAPCON 250 Operating instructions 8595028 00 EN ...
Страница 214: ......
Страница 215: ......