6 Mounting
Maschinenfabrik Reinhausen GmbH 2022
63
8595028/00 EN
TAPCON
®
250
1. Voltage measurement: Feed the wires into the terminals in accordance
with the connection diagram and fasten them using a screwdriver.
2. Current measurement: Feed the wires into the terminals in accordance
with the connection diagram and fasten them using a screwdriver.
6.4.7 Wiring the MC 2-2/SW3-3 assembly
1. Insert the supplied SFP module into the corresponding Ethernet interface
in accordance with the connection diagram and fold the clasp
down.
Figure 45: Engaging the SFP module
Содержание TAPCON 250
Страница 1: ...Voltage regulator TAPCON 250 Operating instructions 8595028 00 EN ...
Страница 214: ......
Страница 215: ......